Bellevue 600

Bellevue 600 is a proposed high-rise office building developed by Amazon in Bellevue, Washington, United States. The 43-story, 600-foot-tall (180 m) building would become the tallest building in Bellevue and include meeting spaces and a retail center when completed in 2024. The project is located in Downtown Bellevue at the intersection of Northeast 6th Street and 110th Avenue Northeast, adjacent to the Bellevue Transit Center and a future Link light rail station. A potential second phase would construct a 33-story tower to the west, replacing an existing office building.

Bellevue 600
The proposed site of Bellevue 600, as seen from the northeast
General information
StatusProposed
TypeOffice and retail
Location600 108th Avenue Northeast
Bellevue, Washington, U.S.
Coordinates47°36′57″N 122°11′42″W
Construction started2021 (planned)
Estimated completion2024
OwnerAmazon
Height
Architectural600 ft (180 m)
Technical details
Floor count43
Floor area1,036,000 square feet (96,200 m2)
Design and construction
Architecture firmNBBJ
DeveloperAmazon
Structural engineerMagnusson Klemencic Associates
Main contractorSellen Construction
Other information
Parking1,175 spaces

History

Bellevue 600 is planned to be located on a block bound to the south by Northeast 6th Street, to the west by 108th Avenue Northeast, and to the east by 110th Avenue Northeast. The Bellevue Corporate Center, a 10-story office building on the southwest corner of the block, was built in 1980 to serve as the regional office of Honeywell.[1][2] A three-story parking garage with 650 stalls was built on the southeast corner of the block and was later joined by a customer service center for the Bellevue Transit Center that opened in 2006.[1][3] The north half of the block is occupied by a church and a surface parking lot, both of which were sold in 2014 and 2015 to a developer planning a three-tower residential complex.[4][5]

In February 2016, Seattle developer Touchstone and Chicago developer Equity Group Investments applied for permits to build a 34-story office building and 41-story hotel with 500 rooms on the south half of the block, which would retain the Bellevue Corporate Center.[6] The master development plan for the project, named "Bellevue 600", was approved by the city government in April 2017 with minor conditions, but Touchstone and Equity did not plan to begin construction.[1] The approved design included a shared podium between the two towers, an underground parking garage with 1,960 stalls, and a pedestrian bridge connecting to a future development on the north side of the block.[1][7]

Equity Commonwealth, a sister company to Equity Group, retained ownership of the Bellevue Corporate Center and the full 3.5-acre (1.4 ha) property and renovated the building in 2016. The property and project rights were sold to Amazon in April 2019 for $194.9 million through a shell corporation named Acorn Development.[8][9] A revised design plan from NBBJ for a 43-story office building was filed for permitting in July 2019, taking advantage of a city zoning change in 2017 that allows buildings with heights of up to 600 feet (180 m).[10] Amazon announced that it plans to begin construction in 2021 and open the building by 2024 as part of a major expansion into Bellevue with 15,000 total employees in the city.[11][12] A 33-story office building on the southwest corner, replacing the Bellevue Corporate Center, is also proposed as part of a potential future phase of construction.[11][13]

Design

The 43-story, 600-foot-tall (180 m) tower would be the tallest building in Bellevue and the tallest to be built by Amazon, surpassing its Seattle campus.[10] It is planned to include 885,000 square feet (82,200 m2) of office space, 121,000 square feet (11,200 m2) of office amenities, and 14,000 square feet (1,300 m2) of retail space, including a potential daycare. The complex would have an underground parking garage with 1,175 stalls that would be shared with a potential 33-story, 430-foot (130 m) tower on the southwest corner of the block.[14][15] A four-story, 16,000-square-foot (1,500 m2) meeting center and public plaza would be located at the southeast corner of the block, facing the Bellevue Downtown light rail station.[11][14] It is designed by Seattle-based NBBJ and is planned to be built by Sellen Construction; both companies previously worked with Amazon on their Seattle campus.[11]

References

  1. Miller, Brian (April 10, 2017). "Touchstone gets MDP approval for 600 Bellevue project". Seattle Daily Journal of Commerce. Retrieved February 6, 2020.
  2. Varney, Val (May 2, 1979). "Honeywell to make regional home here". The Seattle Times. p. H8.
  3. "Around the Eastside: Police substation to open Monday". The Seattle Times. June 23, 2006. p. B3.
  4. Stiles, Marc (March 10, 2015). "Chinese group lays out early plans for big downtown Bellevue property". Puget Sound Business Journal. Retrieved February 6, 2020.
  5. Miller, Brian (March 22, 2018). "Plus sells majority stake in Elev8 to Stanford Hotels for $128M". Seattle Daily Journal of Commerce. Retrieved February 6, 2020.
  6. "Touchstone eyes big project with two towers in Bellevue". Seattle Daily Journal of Commerce. February 26, 2016. Retrieved February 6, 2020.
  7. Stiles, Marc (April 10, 2017). "Bellevue approves Sam Zell's plan for two new downtown towers". Puget Sound Business Journal. Retrieved February 6, 2020.
  8. Rosenberg, Mike; Romano, Benjamin (April 24, 2019). "Amazon grabs large downtown Bellevue property next to transit hub". The Seattle Times. Retrieved February 6, 2020.
  9. Stiles, Marc (January 4, 2019). "Source: Amazon 'most likely' buyer of prime downtown Bellevue property". Puget Sound Business Journal. Retrieved February 6, 2020.
  10. Romano, Benjamin (July 2, 2019). "Amazon plans its tallest tower, marking growing presence in Bellevue". The Seattle Times. Retrieved February 6, 2020.
  11. Stiles, Marc (January 29, 2020). "First look: Amazon's Bellevue 600 skyscrapers designed to be gateway". Puget Sound Business Journal. Retrieved February 6, 2020.
  12. Romano, Benjamin (February 6, 2020). "Amazon plans for 15,000 employees in Bellevue". The Seattle Times. p. A1. Retrieved February 6, 2020.
  13. Levy, Nat (July 3, 2019). "Public records reveal another potential giant Amazon tower in Bellevue". GeekWire. Retrieved February 6, 2020.
  14. Miller, Brian (February 7, 2020). "More details emerge for 2-tower Amazon development in Bellevue". Seattle Daily Journal of Commerce. Retrieved February 8, 2020.
  15. Stewart, Ashley (July 8, 2019). "Details about Amazon's Bellevue 600 project revealed in public records". Puget Sound Business Journal. Retrieved February 6, 2020.

Further reading

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.