Barry Power Station

Barry Power Station is a 230 MWe gas-fired power station on Sully Moors Road in Sully in the Vale of Glamorgan, Wales. It is eight miles west of Cardiff and is next to a large Ineos Vinyls chemicals works that makes PVC and a Hexion Chemicals plant.

Barry Power Station
Barry Power Station
CountryWales, United Kingdom
LocationSully, Vale of Glamorgan
Coordinates51.408134°N 3.228712°W / 51.408134; -3.228712
StatusNon-Operational
Construction began1997
Commission date1998
Decommission date2019
Owner(s)
Operator(s)Centrica
Thermal power station
Primary fuelNatural gas
Combined cycle?Yes
Power generation
Units operational1 x 160 MW
1 x 75 MW
Make and modelSiemens
Nameplate capacity230 MW
External links
CommonsRelated media on Commons

History

Construction began in January 1997 and it was opened on 7 September 1998, being owned by the AES Corporation but trading as AES Barry Ltd. Until 2000 it ran as a base load station. It was bought by Centrica on 24 July 2003 for £39.7m. AES sold the plant because of the low price of electricity at that time.

The closure of the plant was proposed in Centrica's accounts in February 2012, but the following month a contract was signed to use it to supply peak power.[1] This required a reconfiguration to allow full load to be reached more quickly, and redundancy for a third of the workforce.[1] It is now run in an open-cycle mode, halving operating costs, with the option of switching to combined-cycle mode after an hour.[2] The plant ceased generation on 31 March 2019 and closed on 10 May 2019 with demolition proposed to commence in summer 2019. It was observed that demolition was well underway by July 2019 and by September 2019, the grey steel chimney had been removed, thus a previously well-defined landmark had disappeared.

Specification

It is a CCGT-type power station. There is one 160 MWe Siemens V94.2 gas turbine (built by Ansaldo Energia in Genoa and now called the SGT5-2000E) that feeds exhaust gas at 544 °C to a heat recovery steam generator. Steam from this enters a 75 MWe steam turbine running, like the gas turbine, at 3000 rpm. Exhaust steam is passed through an air-cooled condenser and returned to the system as de-aerated feedwater for the HRSG. It connects to the Western Power Distribution section of the National Grid via a substation at 132 kV. The generator on the gas turbine is rated at 180 MVA and has a terminal voltage of 15 kV; the steam turbine's is 11 kV.

The plant is 44% thermally efficient. The chimney is 60 m high.

References

  1. Seal, Chris (15 March 2012). "Barry Power Station to remain open, but jobs will be lost". Barry & District News.
  2. "Centrica runs Barry gas plant (230 MWe) in open-cycle mode at end of life-time". Gas To Power Journal. 26 October 2012.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.