Samarkand–Bukhara high-speed rail line

Samarkand–Bukhara high-speed rail line
Afrosiyob high-speed train
Overview
Type High-speed railway
System Uzbekistan Railways
Status passenger service
Termini Samarkand Railway Station, Samarkand
Bukhara Railway Station, Bukhara
Operation
Opened Aug 25, 2016
Owner Uzbekistan Railways
Operator(s) Uzbekistan Railways
Character Passenger
Rolling stock Talgo 250
Technical
Line length 256 km (159 mi)
Track gauge 1,520 mm (4 ft 11 2732 in) Russian gauge
Operating speed various

The Samarkand–Bukhara high-speed rail line is actually a 256 km continuation of services from Tashkent–Samarkand high-speed rail line rather than a separately operated line, after upgrading. Before opening in 2016, the line was merely a section that operated to Khiva and was not capable of using the same equipment as the first HSR line. However, the two are now interoptible, but further services to Khiva require boarding an ordinary regional train.

The HSR line, also branded Afrosiyob by operator Uzbekistan Railways, to Bukhara ran on Talgo 250 has run to Bukhara for the first time on August 25 2016. Tashkent to Bukhara services (seamlessly on both lines), 600 km, will now take 3 hours and 20 minutes instead of 7 hours.[1]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.