Nordsee-Ost offshore wind farm

Nordsee-Ost offshore wind farm
Country Germany
Location North Sea
Coordinates 54°26′24″N 7°40′48″E / 54.44000°N 7.68000°E / 54.44000; 7.68000Coordinates: 54°26′24″N 7°40′48″E / 54.44000°N 7.68000°E / 54.44000; 7.68000
Status Operational
Commission date May 11, 2015 (2015-05-11)
Owner(s) RWE
Wind farm
Type Offshore
Site area 36 km2[1]
Max. water depth 25 m[1]
Distance from shore 57 km[1]
Hub height 92 m[1]
Rotor diameter 126 m[1]
Power generation
Units operational 48 × 6.15 MW
Make and model Senvion 6.2M126[1]
Nameplate capacity 295.2 MW
Website
Nordsee Ost
Nordsee Ost's location in the wind farms of the German Bight

Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE.

The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower.[2] Steel foundations for generators were supplied by Aker Verdal.[3][4] Power converters were supplied by Woodward Governor Company.[5] A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT.[6]

Delays in power line construction by Dutch TenneT delayed its operational start.[7]

On 11 May 2015 the wind farm was officially put into operation.[8]

See also

References

  1. 1 2 3 4 5 6 "Nordsee Ost Offshore Wind Farm". 4coffshore.com. Retrieved 2017-03-05.
  2. Backwell, Ben (2010-02-01). "REpower to supply 295MW of turbines for RWE's Nordsee Ost". ReCharge. NHST Media Group. (subscription required). Retrieved 2010-07-17.
  3. "Aker wins deal at Nordsee Ost". ReCharge. NHST Media Group. 2010-06-17. (subscription required). Retrieved 2010-07-17.
  4. "Aker Verdal wins wind project in Germany" (Press release). Aker Solutions. 2010-06-17. (subscription required). Retrieved 2010-07-17.
  5. "Woodward power converters chosen for Nordsee Ost". ReCharge. NHST Media Group. 2010-04-15. (subscription required). Retrieved 2010-07-17.
  6. Backwell, Ben (2010-07-16). "Siemens and Prysmian win €500m Nordsee-Ost wind farm contract". ReCharge. NHST Media Group. Archived from the original on 2012-02-24. Retrieved 2017-03-05.
  7. David Crossland (6 March 2012). "German wind energy plans in the doldrums". thenational.ae. Retrieved 24 June 2015.
  8. "G7-Energieministertreffen in Hamburg". Bundesministerium für Wirtschaft und Energie. 2015-05-11.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.