Newburn Bridge

Newburn Bridge
Newburn Bridge viewed from the south east, June 2004
Coordinates 54°58′51″N 1°44′37″W / 54.9807°N 1.7436°W / 54.9807; -1.7436
OS grid reference NZ165652
Carries
  • Motor Vehicles
  • Cycles
  • Pedestrians
Crosses River Tyne
Locale Tyneside
Preceded by Wylam Bridge
Followed by Blaydon Bridge
Characteristics
Design Lattice girder bridge
Material Steel
Pier construction Wrought iron filled with concrete
Total length 144.8 m (475 ft)
Width 8.54 m (28 ft)
No. of spans 4
Piers in water 3
Load limit 10 t
No. of lanes Single carriageway controlled by traffic lights
History
Designer Sandeman & Moncrieff
Constructed by Head Wrightson
Construction start 1892
Construction end 1893
Opened 21 May 1893 (1893-05-21)
Newburn Bridge
Location in Tyne and Wear

Newburn Bridge is a road bridge crossing the River Tyne at Newburn in Newcastle upon Tyne, England. It links Newburn, Walbottle and Throckley on the north side of the river with Ryton, Stella and Blaydon on the south side. The bridge is the western-most crossing of the Tyne in the county of Tyne and Wear; the next crossing upstream, Wylam Bridge, is in Northumberland.

History

This part of the river has been forded since Roman times because it is the most eastern part of the Tyne that is easily fordable. There have also been numerous ferries operated in the part of the river around Newburn. A bridge was finally built between 1892 and 1893. It was designed by Sandeman & Moncrieff of Newcastle and built by Head Wrightson of Thornaby-on-Tees. It was opened on 21 May 1893. For the first 50 or so years of its use, it was a toll bridge, until it was bought by Northumberland County Council in 1947. The toll house on the northeast side of the bridge has since been demolished. The bridge used to have two lanes crossing it up until the 1960s. It has since had single road traffic because of the weight limit of 9 tonnes (8.858 long tons; 9.921 short tons), later raised to 10 tonnes (9.842 long tons; 11.02 short tons).

In 2007 the bridge was closed for a number of months for renovation and repainting.

In 2018 the bridge closed and will remain closed for several months, except for footpath access. [1]

References

  1. "'Vital' Newburn Bridge repairs to take up to two months". BBC News. BBC. 26 May 2018. Retrieved 4 September 2018.
Next bridge upstream River Tyne Next bridge downstream
Wylam Bridge  Newburn Bridge
Grid reference: NZ165652
Blaydon Bridge
A1 road 


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.