Nadikudi–Srikalahasti section

Nadikudi–Srikalahasti section
Nadikudi-srikalahasti route details
Overview
Status Under construction
Locale Andhra Pradesh
Termini Nadikudi
Srikalahasti
Operation
Owner Indian Railway
Operator(s) South Central Railway zone
Technical
Line length 308 km (191 mi)
Track gauge 1,676 mm (5 ft 6 in)


The Nadikudi–Srikalahasti section is an ongoing railway section project of the Indian Railways. The section falls under the administration of Guntur and Guntakal railway divisions of South Central Railway zone.This serves as alternative route to Delhi-Chennai and Howrah-Chennai routes.

The project

The project connects Secunderabad-Guntur Branch line at Nadikudi of Guntur district and Gudur-Katpadi Branch line at Srikalahasti of Chittoor district in the Indian state of Andhra Pradesh. The total length of the section is 308 km (191 mi) estimated cost of the project is 2,452 crore (US$340 million).[1] The railway stations of which lies between the nodal stations are Nekarikallu, Rompicherla, Vinukonda, Gundlakamma, Darsi, Podili, Obulayapalli, Kanigiri, Pamuru, Rapur and Venkatagiri.[2]

Phase-1

Nadikudi (Guntur-Hyderabad route) to Savalyapuram (Guntur-Guntakal route) track, trial run completed. Electrification proposals for the completed route are sent to Higher authorities. By the end of 2018, this new route will be added to Guntur-Guntakal route. DRM Guntur says that project deadline is 2022.[3]. At Rapur station both Nadikudi–Srikalahasti and Krishnapatnam–Obulavaripalle railway line cross each other.

Proposed list of stations

Nadikudi–Srikalahasti section
km
To Pagidipalli–Nallapadu section
To Nadikudi–Macherla branch line
0 Nadikudi
12 Tummalacheruvu
15 Kamepalli
22 Piduguralla
27 Sitaramapuram
To Pagidipalli–Nallapadu section
39 Nekarikallu
49 Kunkaraguntla (Halt)
55 Rompicherala
67 Velpuru North (Halt)
To Nallapadu–Nandyal section
73 Savalyapuram
83 Vinukonda
90 Cheekategalapalem
96 Gundlakamma
To Nallapadu–Nandyal section
110 Dekanakonda
123 Darsi
130 Rajampalle (Halt)
139 Mallawaram (Halt)
147 Podili
162 Gautuvaripalle
170 Garlapeta Road (Halt)
175 Kanigiri
181 Lingareddypalle (Halt)
194 Ballipalle
199 Narmarella (Halt)
209 Pamuru
220 Kakullavaripalle (Halt)
228 Gollavaripalle
241 Ravipadu (Halt)
249 Vinjamur
256 Dubagunta (Halt)
262 Pamidipallu (Halt)
270 Atmakur
279 Obulayapalle
284 Kottavuru (Halt)
300 Venkatapuram
311 Aduripalli
to Krishnapatnam–Obulavaripalle section
325 Rapuru
To Krishnapatnam–Obulavaripalle section {BS7BHFexHSTObulavaripalli}}
To Guntakal–Renigunta section
335 Vellampalle (Halt)
343 Alturupadu
349 Balasamundram (Halt)
To Gudur–Chennai section
358 Venkatagiri
364 Yataluru
370 Yellakaru
378 Akkurti
383 Srikalahasti
To Gudur–Chennai section

It starts from Nadikudi railway Junction in Secundrabad-Guntur lane and passes through Piduguralla and from there new line starts with Nakirekal, Rompicherla and connects with Guntur-Gunthakal section at Savalyapuram and passes through vinukonda and again enters new line from Gundlakamma which passes though Darsi,podili, kanigiri, Pamuru, Vinajmuru, Dubagunta, Atmakuru, Obulayapalle, Rapuru and finally connects Venkatagiri at Gudur-Renigunta section.

References

  1. "PM Narendra Modi Reviews Railway Projects in Andhra Pradesh". NDTV.com. Retrieved 2016-05-24.
  2. "Nadikudi - Srikalahasti line to ensure better connectivity". The Hindu. 2015-11-09. ISSN 0971-751X. Retrieved 2016-05-24.
  3. "SCR GM and government officials review rail projects". Retrieved 2018-08-12.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.