List of O-Train stations

The O-Train is a light-rail transit (LRT) system in Ottawa, Ontario, Canada operated by OC Transpo. The only operating line is the Trillium Line (French: Ligne Trillium); a diesel light-rail transit (DLRT) service. The present line runs north-south on a railway line, from Bayview to Greenboro, a distance of approximately 8 kilometres (5 mi) and consisting of 5 stations. It is isolated from road traffic, but shared with other trains; after operating hours the track has been infrequently used by Ottawa Central for freight service to the National Research Council.

List of O-Train stations

Rapid transit map
LineStationsTrack
Trillium Line 5 8 km (5.0 mi)
Station Line Opened Grade
Bayview 2001Underpass
Carling 2001Trench
Carleton 2001Surface
Mooney's Bay 2001Surface
Greenboro 2001Surface

List of future O-train stations

The Confederation Line is a light rail transit (LRT) line under construction in Ottawa, Ontario, Canada and will consist of 13 stations including 3 new underground stations (St Laurent was an existing underground station that was converted). The Confederation Line will be part of the O-Train network operated by OC Transpo along with the existing diesel-powered Trillium Line.[1] Stage 2 will add an additional 16 stations to the system

Station Line Opening Grade
Tunney's Pasture 2019Trench
Pimisi 2019Underpass
Lyon 2019Underground
Parliament 2019Underground
Rideau 2019Underground
uOttawa 2019Surface
Lees 2019Trench
Hurdman 2019Elevated
Tremblay 2019Underpass
St-Laurent 2019Underground
Cyrville 2019Underpass
Blair 2019Surface
Gladstone station 2021Trench
Walkley station 2021Surface
South Keys station 2021Surface
Uplands station 2021Elevated
Airport Station 2021Elevated
Leitrim station 2021Surface
Earl Armstong/Bowesville 2021Surface
Limebank 2021Surface
Trim 2022Surface
Place d'Orléans 2022Surface
Orleans Blvd 2022Surface
Jeanne D'Arc 2022Surface
Montreal Rd 2022Surface
Westboro 2023Trench
Dominion 2023Surface
Cleary 2023Underground
New Orchard 2023Underground
Lincoln Fields 2023Surface
Iris 2023Surface
Baseline 2023Underground
Queensview 2023Surface
Pinecrest 2023Surface
Bayshore 2023Surface
Moodie 2023Surface

References

  1. "Transit commission on board with new O-Train name". Metro News. September 17, 2014. Retrieved December 2014. O-Train passengers could be boarding the expanded and newly named Trillium Line by mid-November Check date values in: |accessdate= (help)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.