Line 8 (Changchun Subway)
Line 8 | |
---|---|
8 | |
Overview | |
Other name(s) | Beihu Line (北湖线) |
Type | Rapid transit |
System | Changchun Subway |
Status | Operational |
Locale | Changchun, Jilin, China |
Termini |
North Ring Road Guangtong Road |
Stations | 13 |
Services | 1 |
Operation | |
Opened | 30 September 2018 |
Owner | Changchun |
Operator(s) | Changchun Rail Transit Corporation |
Character | Elevated |
Technical | |
Line length | 13.4 km (8.33 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Line 8 of the Changchun Subway (Chinese: 长春地铁8号线; pinyin: Chángchūn Dìtiě Bā Hào Xiàn) a rapid transit line running from south to north in northern Changchun. It will be operational on 30 September 2018. This line is 13.4 km long with 13 stations.[1]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
North Ring Road — Guangtong Road | 30 September 2018 | 13.4 km (8.33 mi) | 13 | Phase 1 |
Service routes
- North Ring Road — Guangtong Road
stations
station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
North Ring Road | 北环城路 | 1 | 0.00 | 0.00 | Kuancheng | ||
No.123 Middle School | 一二三中学 | 1.23 | 1.23 | ||||
Xiaonan | 小南 | 1.11 | 2.34 | ||||
Xiaochengzi Street | 小城子街 | 0.66 | 3.00 | ||||
North Lake Bridge | 北湖大桥 | 2.37 | 5.37 | ||||
North Lake Park | 北湖公园 | 0.95 | 6.32 | ||||
He'an Street | 和安街 | 0.77 | 7.09 | ||||
Guangji Road | 光机路 | 1.46 | 8.55 | ||||
Daxuecheng Road | 大学成路 | 1.00 | 9.55 | ||||
Institute of Geography | 地理所 | 1.33 | 10.88 | ||||
Olympic Park | 奥林匹克公园 | 1.07 | 11.95 | ||||
Guangtong Road | 广通路 | 1.25 | 13.20 | ||||
References
- ↑ "9月30日前长春地铁2号线、轻轨北湖线全部通车". Sina. Jilin News Network. Retrieved 16 May 2018.
This article is issued from
Wikipedia.
The text is licensed under Creative Commons - Attribution - Sharealike.
Additional terms may apply for the media files.