Line 2 (Changchun Subway)

Line 2
 2 
Dongfang Square Station
Overview
Type Rapid transit
System Changchun Subway
Status Operational
Locale Changchun, Jilin, China
Termini Shuangfeng
Dongfang Square
Stations 18
Services 1
Operation
Opened 30 August 2018
Owner Changchun
Operator(s) Changchun Rail Transit Corporation
Character Underground
Technical
Line length 20.5 km (12.74 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 2 of the Changchun Subway (Chinese: 长春地铁2号线; pinyin: Chángchūn Dìtiě Èr Hào Xiàn) a rapid transit line running from west to east Changchun. It started to be operational on 30 August 2018. This line is 22.8 km long with 19 stations.[1]

Opening timeline

SegmentCommencementLengthStation(s)Name
Shuangfeng — Dongfang Square 30 September 2018 20.5 km (12.74 mi) 18 Phase 1

Service routes

  • Shuangfeng — Dongfang Square

stations

station name Connections Distance
km
Location
English Chinese
Xihu 西湖 0.00 0.00 Luyuan
Shuangfeng 双丰 2.18 2.18
Changchun West Railway Station 长春西站  CJ ~ JH  Trams in Changchun Trams 55 Changchun West railway station CRT 1.52 3.70
Xinglongpu 兴隆堡 2.09 5.79
West Ring Road 西环城路 1.41 7.20
Heping Street 和平大街 1.14 8.34
Wanfu Street 万福街 Trams in Changchun Trams 54 0.82 9.16
Jingyang Square 景阳广场 0.86 10.02
Jiefang Overpass 解放桥  3 [lower-alpha 1] 1.07 11.09 Luyuan/Chaoyang
Jianshe Square 建设广场 0.80 11.89 Chaoyang
Wenhua Square 文化广场 0.75 12.64
Jiefang Avenue 解放大路  1  1.36 14.00 Chaoyang/Nanguan
Pingyang Street 平阳街 0.78 14.78 Nanguan
Nanguan 南关 1.12 15.90
Jilin Avenue 吉林大路  4 [lower-alpha 1] 1.31 17.21 Erdao
Dongsheng Street 东盛大街 0.99 18.20
East Ring Road 东环城路 1.46 19.66
Changqing 长青 1.27 20.93 Erdao/Nanguan
Dongfang Square 东方广场 1.38 22.31 Erdao
  1. 1 2 Out of system transfer.

References

  1. "9月30日前长春地铁2号线、轻轨北湖线全部通车". Sina. Jilin News Network. Retrieved 16 May 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.