Line 7 (Hangzhou Metro)

Line 7
 7 
Overview
Type Rapid transit
System Hangzhou Metro
Status Under consturation
Locale Hangzhou, China
Termini Wushan Square
Jiangdong'er Road[1]
Stations 22
Services 1
Operation
Planned opening 2021[2]
Owner City of Hangzhou
Operator(s) Hangzhou Metro Corporation
Character Underground
Technical
Line length 47.48
Electrification Third rail, 1,500 V DC
Line 7 drawn to scale.

Line 7 of the Hangzhou Metro (simplified Chinese: 杭州地铁七号线; traditional Chinese: 杭州地鐵七號線; pinyin: Hángzhōu Dìtiě Qīhào Xiàn) is a subway line under construction[3][4]. The line will be 47.48 km long and will run in a west-east direction between Wushan Square Station in Shangcheng District and Jiangdong'er Road Station in Dajiangdong Industrial Cluster in the east[5], passing through downtown Hangzhou and providing transfers with multiple other lines in the system. The line is expected to be operational by late 2021[6].

Stations

Station name Connections
English Chinese
Wushan Square 吴山广场
Jiangcheng Road 江城路  5 
Chengzhan 城站  1  5 Hangzhou railway station HZH
Sijiqing 四季青  9 
Citizen Center 市民中心  4 
Aoti 奥体  6 
Jianshesi Road 建设四路
Mingxing Road 明星路
Jianshesan Road 建设三路  2 
Gengwen Road 耕文路  11 
Nongdu 农都
Shengdong 盛东
Hehuan Road 合欢路
Yingzhong 盈中
Kanshan 坎山
Airport West 机场西
Xiaoshan International Airport 萧山机场  1 Hangzhou Xiaoshan International Airport HGH
Jingjiang 靖江
Yipeng 义蓬  13 
Tangxinxian 塘新线
Hejing Road 河景路  8 
Bei'er Road 北二路
Jiangdong'er Road 江东二路

See also

Reference

  1. "杭州地铁三期新增机场轨道快线、3号线北延、5号线西延". ZJNews. 6 March 2018.
  2. "杭州地铁三期新增机场轨道快线、3号线北延、5号线西延". ZJNews. 6 March 2018.
  3. "杭州地铁7号线即将开工 吴山广场暂时全封闭至2021年底". Hangzhou Daily. 20 August 2017.
  4. "关于(杭州市)杭州地铁7号线工程的批前公示". 23 May 2017.
  5. "终于等到你 杭州地铁三期10条线路获批". Qianjiang Evening Post. 22 December 2017.
  6. "Hangzhou Subway expansion". APT News Channel. 23 February 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.