Line 4 (Hangzhou Metro)

Line 4
 4 
Overview
Type Rapid transit
System Hangzhou Metro
Status Opernational
Locale Hangzhou, Zhejiang, China
Termini Pengbu
Puyan
Stations 17
Daily ridership 113,900 (2015 Peak)[1]
Operation
Opened February 2, 2015
Owner Hangzhou
Operator(s) Hangzhou Metro Corporation
MTR Corporation (Hangzhou)
Character Underground
Technical
Line length 20.8 km (12.92 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 4 of the Hangzhou Metro (Chinese: 杭州地铁四号线; pinyin: Hángzhōu Dìtiě SìHào Xiàn) a rapid transit line whose second phase is currently under construction in Hangzhou.

To scale maps of Hangzhou Metro Line 4

Opening timeline

SegmentCommencementLengthStation(s)Name
Pengbu — Jinjiang 2 February 2015 9.6 km (5.97 mi) 9 Phase 1 (initial section)
Xintang 28 June 2015 Infill station 1
Jinjiang — Puyan 9 January 2018 11.2 km (6.96 mi) 7 Phase 1 (final section)
Lianzhuang 6 June 2018 Infill station 1

Opened Stations

Station name Connections Distance
km
Location
English Chinese
Pengbu 彭埠  1  0.00 0.00 Jianggan
East Railway Station 火车东站  1   6  Hangzhou East railway station HGH 1.10 1.10
Xinfeng 新风 0.60 1.70
Xintang 新塘 1.25 2.95
Jingfang 景芳 1.15 4.10
Qianjiang Road 钱江路  2   9  1.45 5.55
Jiangjin Road 江锦路 0.95 6.50
Citizen Center 市民中心  7  0.65 7.15
Chengxing Road 城星路 0.75 7.90
Jinjiang 近江  1  1.30 9.20 Shangcheng
Yongjiang Road 甬江路
Nanxingqiao 南星桥
Fuxing Road 复兴路
Shuichengqiao 水澄桥
Lianzhuang 联庄 Binjiang
Chinese Medical University 中医药大学
Yangjiadun 杨家墩
Puyan 浦沿

References

  1. 霍翟羿. "113.09万人次! 杭州地铁"五一"客流破百万". Zhejiang News. Retrieved Jan 5, 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.