Line 3 (Changchun Subway)

Line 3
 3 
Yataidajie Station
Overview
Type Light Rail
System Changchun Subway
Status Operational
Locale Changchun, Jilin, China
Termini Changchun Railway Station
Changyingshijicheng
Stations 33
Services 2
Operation
Opened 30 October 2002
Owner Changchun
Operator(s) Changchun Rail Transit Corporation
Character At-grade and elevated
Technical
Line length 31.9 km (19.82 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 3 of the Changchun Subway (Chinese: 长春轻轨三号线; pinyin: Chángchūn Qīngguǐ Sān Hào Xiàn) a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006. This line is currently 31.9 km long with 33 stations.[1] Line 3 is currently upgrading sections of the line into a light metro line.

Opening timeline

SegmentCommencementLengthStation(s)Name
Changchun — Weiguangjie 30 October 2002 14.9 km (9.26 mi) 17 Phase 1
Weiguangjie — Changyingshijicheng 26 December 2006 17.0 km (10.56 mi) 16 phase 2

Service routes

stations

Service
routes
station name Connections Distance
km
Location
English Chinese
Weihuanggong 伪皇宫  4  0.00 Kuancheng
Nanyataidajie 南亚泰大街 1.05
Changchun Railway Station (underground) 长春站  1   CJ ~ JH   CB ~ BA  Changchun railway station CCT 1.23
Liaoninglu (Permanently closed) 辽宁路
Furongqiao (Temporary closed) 芙蓉桥 1.86
Changchun Railway Station (at-grade) 长春站  1   CJ ~ JH   CB ~ BA  Changchun railway station CCT 0.00 0.00 Kuancheng
at-grade crossing
Liaoninglu 辽宁路 0.55 0.55
Furongqiao (Temporary closed) 芙蓉桥 1.20 1.75
Xi'anqiao 西安桥 0.80 2.55 Luyuan/Chaoyang
Nanchanglu 南昌路 0.65 3.20
Chaoyangqiao 朝阳桥 0.65 3.85
Jiefang Overpass 解放桥  2 [lower-alpha 1] 1.00 4.85
Huxiqiao 湖西桥 0.90 5.75
Kuanpingqiao 宽平桥 Trams in Changchun Trams 54 and 55 0.95 6.70
Fusonglu 抚松路 1.05 7.75
Nanhudalu 南湖大路 0.60 8.35 Chaoyang
at-grade crossing
Huguanglu 湖光路 0.85 9.20
Guigudajie 硅谷大街 1.60 10.80
Qianjindadao 前进大道 0.70 11.50
Qianjindajie 前进大街 0.50 12.00
at-grade crossing
Weimingjie 卫明街 0.75 12.75
at-grade crossing
Weiguangjie 卫光街 1.05 13.80
at-grade crossing
Weixing Square 卫星广场  1 [lower-alpha 1] 0.65 14.45 Chaoyang/Nanguan
Yataidajie 亚泰大街 1.25 15.70 Nanguan
Yitonghe 伊通河 0.85 16.55
Linhejie 临河街  4  (Weixinglu) - adjacent station 1.35 17.90 Erdao
Xiantaidajie 仙台大街 1.05 18.95
Huizhanzhongxin 会展中心 0.90 19.85
Shijiguangchang 世纪广场 1.10 20.95
Zhongyiyaodaxue 中医药大学 1.55 22.50 Nanguan
Dongbeishi 东北师大 0.85 23.35
Buoxuelu 博学路 1.20 24.55
Nongbuoyuan 农博园 0.95 25.50
Jingyuegongyuan 净月公园 1.30 26.80
Zibinlu 紫彬路 1.50 28.30
Fuzhilu 福祉路 1.00 29.30
Huaxuechang 滑雪场 1.25 30.55
at-grade crossing
Changyingshijicheng 长影世纪城 0.55 31.10

See also

Notes

  1. 1 2 Out of system transfer.

References

  1. "12月26日长春轻轨二期将运行 可能采用阶梯票价". 搜狐. Retrieved 2012-10-04.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.