Line 2 (Xuzhou Metro)
Line 2 | |
---|---|
Overview | |
Native name | 徐州地铁2号线 |
Type | Rapid transit |
System | Xuzhou Metro |
Status | Under construction |
Locale | Xuzhou, Jiangsu |
Termini |
Keyunbei Station Xinchengqu East Station |
Stations | 20 |
Operation | |
Commenced | 2016 |
Planned opening | October 1, 2020 |
Character | Underground |
Rolling stock | Type B (CRRC Nanjing Puzhen) |
Technical | |
Line length | 14.2 km (8.8 mi) |
Number of tracks | 2 |
Operating speed | 80 km/h (50 mph) |
Line 2 of the Xuzhou Metro (Chinese: 徐州地铁2号线; pinyin: xú zhōu dì tiě èr hào xiàn) is a rapid transit line under construction in Xuzhou city, Jiangsu province, China. Construction commenced in February 2016,[1] and the line is expected to open on October 1, 2020. It will be the second metro line to open in Xuzhou.
Line 2 runs primarily north-south through Xuzhou's CBD and Xuzhou New District, from Keyunbei Station in the north to Xinchengqu East Station in the south.
Line overview
Station Name | Platform Type | Connections | Status | |
---|---|---|---|---|
English | Chinese | |||
Keyunbei Station | 客运北站 | Underground, island | Under construction | |
Liwo | 李沃 | |||
Jiulishan | 九里山 | |||
Benteng Avenue | 奔腾大道 | 7 | ||
Jiulonghu | 九龙湖 | |||
Qinyunqiao | 庆云桥 | |||
Pengcheng Square | 彭城广场 | 1 | ||
Hubushan | 户部山 | |||
Normal University | 师大云龙校区 | 5 | ||
Central Hospital | 中心医院 | |||
Huaita | 淮塔 | 3 | ||
Kejicheng | 科技城 | |||
Qiligou | 七里沟 | 4 | ||
Baiguoyuan | 百果园 | |||
Tuolongshan | 拖龙山 | |||
Dalong Lake | 大龙湖 | |||
City Administrative Center | 市行政中心 | 6 | ||
Hanyuan Avenue | 汉源大道 | |||
Xinyuan Avenue | 新元大道 | 5 | ||
Xinchengqu East | 新城区东 | S2 |
Note: English names are not official and may change when official route maps are published.
History
Xuzhou Metro Line 2 officially began construction on February 22, 2016. As of September 2018, about half of the stations have begun main structure construction, while the other half have been capped successfully. Tunneling has begun on most stations, with eight stations having tunneled through for both tracks on the line.
Civil engineering work on Line 2 is expected to complete in May 2019, with railway work completing in October 2019. Installation of electromechanical equipment will complete in March 2020, railway adjustment work will complete in June 2020, rolling stock will be tested on the line from July 1 to September 30, 2020, and the line will open to traffic on October 1, 2020.[1][2]
As of 2018, the second phase has not begun construction; it will include six elevated stations to the south of Xinchengqu East Station.
References
- 1 2 "轨道交通2号线一期工程中心医院站主体结构顺利封顶" [The main structure of the Central Hospital Station on the first phase of rail transit line 2 was successfully capped]. Xuzhou Rail Transit. 2018-08-31.
- ↑ "Xuzhou ditie zuixinxiaoxi! Yihao xian mingnian Shiyue tongche!" 徐州地铁最新消息!1号线明年10月通车! [Xuzhou Metro latest news! Line 1 will open to traffic in October next year!]. Xuzhou Metro Loop. 2018-09-22. Retrieved 2018-09-22.