Line 2 (Ningbo Rail Transit)

Line 2
 2 
Overview
Type Rapid transit
System Ningbo Rail Transit
Status Operational
Locale Ningbo, Zhejiang, China
Termini Lishe International Airport
Qingshuipu
Stations 28
Operation
Opened 26 September 2015
Owner Ningbo
Operator(s) Ningbo Rail Transit Co.,Ltd.
Character Underground
Elevated
Technical
Line length 28.35 km (17.62 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 2 of Ningbo Rail Transit (Chinese: 宁波轨道交通2号线) is a rapid transit line in Ningbo. It stretches from Ningbo Lishe International Airport in the southwest towards Zhenhai in the northeast of the city and will further run into Xiaogang Township, Beilun. The line started service on 26 September 2015.[1]

Route

Line 2 will be the second metro line in Ningbo. It starts near Ningbo Lishe International Airport and stretches eastwards as underground tunnels. After reaching Youngor Avenue it turns northwards and passes Ningbo Textile City following which the route zigzags into Ningbo Coach Terminal and then goes eastwards while crosses Ningbo railway station, the main railway station of the city. Then the route extends northwards into Jiangbei District and turn eastwards until it reaches Lulin Market, where it turns into viaducts before reaching Zhenhai District. The line will go further into Xiaogang Township in the second phase of construction.[2]

Opening timeline

SegmentCommencementLengthStation(s)Name
Lishe International Airport — Qingshuipu 26 September 2015 28.4 km (17.65 mi) 28 Phase 1

Stations

Station name Connections Distance
km
Location
English Chinese
Lishe International Airport 栎社国际机场 Ningbo Lishe International Airport NGB 0.00 0.00 Haishu
Lishe 栎社 2.40 2.40
Yinzhou Avenue 鄞州大道 1.67 4.07
Shiqi 石碶  5  1.11 5.18
Qingfangcheng 轻纺城 1.24 6.42
Ouchi 藕池 1.47 7.89
Coach Terminal 客运中心 1.20 9.09
Liyuan South Road 丽园南路 1.00 10.09
Yunxia Road 云霞路 0.85 10.94
Ningbo Railway Station 宁波火车站  4  (  Yongyu ) Ningbo railway station NGH 1.30 12.24
Chenghuangmiao 城隍庙 1.48 13.72
Gulou / Drum Tower 鼓楼  1  0.60 14.32
Waitan Bridge 外滩大桥  7  1.40 15.72 Jiangbei
Zhengda Road 正大路  6  0.80 16.52
Nijiayan 倪家堰 1.07 17.59
Yasaiyan 压赛堰 1.20 18.79
Datong Bridge 大通桥  3  0.60 19.39
Kongpu 孔浦 1.05 20.44
Lulin 路林 2.10 22.54
Sanguantang 三官堂  5  0.87 23.41
Ningbo University 宁波大学 1.30 24.71
Qingshuipu 清水浦 2.85 27.56 Zhenhai

Phase 2 (to open in 2018)

Station name Connections Location
English Chinese
Wulipai 五里牌 Zhenhai
Fengyuan 枫园
Congyuan Road 聪园路
Zhaobao Mountain 招宝山
Honglian 红联  6  Beilun

References

  1. "Ningbo opens second metro line". Railway Gazette International. 28 September 2015. Retrieved 2016-03-19.
  2. "2号线一期工程今日动工 环城北路站等七大站点开建" [Line 2 Ring Road project started today with seven stations open construction site]. news.cnnb.com (in Chinese). 23 December 2010.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.