Line 1 (Tianjin Metro)
Line 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
A train at Liuyuan | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Tianjin Metro | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Tianjin, China | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
Caijingdaxue Liuyuan | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 22 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened |
28 December 1984 (old system) 12 June 2006 (new system) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closed | 2001 to 2006 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Tianjin | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Tianjin Metro Corporation | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground, At-grade, & Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 26.2 km (16.28 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Line 1 of the Tianjin Metro (Chinese: 天津地铁一号线; pinyin: Tiānjīn Dìtiě Yī Hào Xiàn) runs 26.2 km from the north-west to the south-east of downtown Tianjin and serves 22 stations. It started operations on 12 June 2006. The line was rebuilt from the original Tianjin Metro line, which opened in 1976, but had to close down and undergo renovations in 2001 as part of the system's modernizing project. The line's color is red.
History
Construction began in 1970. The first section, spanning 3.6 km of track and 4 stations, which are named Xinhua Road, Yingkoudao, Anshandao and Haiguangsi stations, was completed by February 1976. The second section, with an additional 1.6 km of track and the Xinanjiao and Erweilu stations, was completed by 1980. After construction resumed, the total length was 7.4 km, with 8 stations, and service on the line began on 28 December 1984.
To cut construction costs, the authority used an abandoned canal bed to build part of the system. Thus the underground section is only 2–3 meters beneath the street surface, and was the world's shallowest metro. Years later, train frequency reduced and trains were commonly delayed. The rolling stocks themselves where dilapidated, with most seat covers torn off, and lights becoming dim. To change to a more modern and cleaner system in East Asia, a massive reconstruction, modernization and expansion plan was laid out in 2000. In preparation, the system was closed on 1 September 2001, with renovation totally started on 21 November after being delayed due to the terrorist attacks of 11 September. After introducing new rolling stocks, adding half-height platform screen doors and extending the line to Shuanglin, the line was completed at the end of 2005 and was re-opened on 12 June 2006.
In 2008, Xizhan Station was temporarily closed for three years for the reconstruction of the Tianjin West railway station. It reopened on 1 July 2011.
In 2016, Shuanglin Station was closed to make way for the line's southern extension, which is expected to enter operation in 2018. The signal system was also replaced by the new ATO system, and the running stock was also overhauled.
Details
- Coaches per train - 6.
- Frequency - 7–8 minutes in peak hours & 15 minutes at other times.
- Operating hours - 5:30 to 22:30.
Infrastructure
Alignment and interchanges
The line is underground between Liuyuan and Tucheng stations, and elevated for the other five stations. All elevated stations are entirely covered by mixture of transparent & opaque corrugated sheets. The line passes through six districts, namely Beichen, Hongqiao, Nankai, Heping, Hexi and Jinnan. The whole journey takes about twelve minutes. The line is currently not linked to other lines, but interchanges to future lines will be available when the new lines enter operation.
Concourse Level
all Line 1 station concourses are equipped with a customer service center, ticket vending machines, automatic fare gates, and Shenzhen Development Bank ATMs.
Platform level
For security and other reasons, All Line 1 stations have half-high security doors installed. TVs are installed that display travel tips, advertising, alerts, and waiting time for the next train.
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Xinhualu — Haiguangsi | 1 January 1976[lower-alpha 1] | 2.60 km (1.62 mi) | 4 | (1st section) |
Haiguangsi — Xi'nanjiao | 1 January 1980[lower-alpha 1] | 1.84 km (1.14 mi) | 2 | (2nd section) |
Xi'nanjiao — Xizhan | 28 December 1984 | 2.25 km (1.40 mi) | 2 | (3rd section) |
Xinhualu | 9 October 2001 | Permanently ceased operation | -1 | Line 1 renovation project |
Yingkoudao — Xizhan | 9 October 2001 | Temporary ceased operation | -7 | |
Shuanglin — Yingkoudao | 12 June 2006 | 12.3 km (7.64 mi) | 9 | |
Yingkoudao — Xizhan | Reentered operation | 7 | ||
Xizhan — Liuyuan | 8.2 km (5.10 mi) | 6 | ||
Shuanglin | 28 December 2016 | Temporary ceased operation | -1 | Eastern extension |
Stations (east to west)
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Shuanglin (Temporary Closed) | 双林 | 0.00 | 0.00 | Jinnan | |
Caijingdaxue | 财经大学 | 1.61 | 1.61 | Hexi | |
Huashanli | 华山里 | 1.48 | 3.09 | ||
Fuxingmen | 复兴门 | 1.33 | 4.42 | ||
Chentangzhuang | 陈塘庄 | 1.23 | 5.65 | ||
Tucheng | 土城 | 1.59 | 7.24 | ||
Nanlou | 南楼 | 1.10 | 8.34 | ||
Xiawafang | 下瓦房 | 5 | 1.05 | 9.39 | |
Xiaobailou | 小白楼 | 1.45 | 10.84 | Heping | |
Xinhualu (Permanently Closed) | 新华路 | 0.71 | 11.55 | ||
Yingkoudao | 营口道 | 3 | 0.80 | 12.35 | |
Anshandao | 鞍山道 | 0.87 | 13.22 | ||
Haiguangsi | 海光寺 | 0.93 | 14.15 | Nankai | |
Erweilu | 二纬路 | 1.06 | 15.21 | ||
Xi'nanjiao | 西南角 | 2 | 0.78 | 15.99 | |
Xibeijiao | 西北角 | 1.02 | 17.01 | Hongqiao | |
Xizhan | 西站 | 6 |
1.23 | 18.24 | |
Honghuli | 洪湖里 | 1.66 | 19.90 | ||
Qinjiandao | 勤俭道 | 1.15 | 21.05 | ||
Benxilu | 本溪路 | 1.45 | 22.50 | ||
Jiayuanli | 佳园里 | 1.24 | 23.74 | Beichen | |
Ruijingxinyuan | 瑞景新苑 | 1.06 | 24.80 | ||
Liuyuan | 刘园 | 1.00 | 25.80 | ||
- Eastern extension
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Shuangqiaohe | 双桥河 | Jinnan | |||
Xianshuigubei | 咸水沽北 | ||||
Donggulu | 东沽路 | ||||
Guozhanlu | 国展路 | ||||
Beiyangcun | 北洋村 | ||||
Shangguozhuang | 上郭庄 | ||||
Gaozhuangzi | 高庄子 | ||||
Hongnihedong | 洪泥河东 | ||||
Lishuanglubei | 梨双路北 | ||||
Lilou | 李楼 |
Rolling Stock
Type | Time of manufacturing | Series | Sets | Assembly | Notes |
---|---|---|---|---|---|
Type B | 2005 - 2006 | DKZ9 (Replaced) | 25 | Tc+M+T+M+M+Tc | Manufactured by CNR Changchun Railway Vehicles |
Type B | 2016 | Unknown | 25 | Tc+M+T+M+M+Tc | Manufactured by CRRC |