Kentucky Route 67

KY 67 at the Kentucky Route 207 interchange.

Kentucky Route 67 marker

Kentucky Route 67
Industrial Parkway
Route information
Maintained by KYTC
Length 14.219 mi[1] (22.883 km)
Existed 2002 – present
Major junctions
South end I-64 near Grayson
  US 23 in Wurtland
North end KY 3105 in Wurtland
Location
Counties Greenup, Carter, Boyd
Highway system
KY 66US 68

Kentucky Route 67 (KY 67) is a Kentucky State Highway originating at a junction with Interstate 64 near Grayson, Kentucky in Carter County. The route continues through rural ridgetops in Greenup County and briefly touches Boyd County before terminating at U.S. Highway 23 in Greenup County in between Wurtland and Greenup. KY 67 is also known as the Industrial Parkway.

Construction began on phase one in the spring of 1997. The first segment of the Industrial Parkway extended a little over three miles (5 km) to a new industrial park. A trumpet interchange was constructed at milepost 179 on Interstate 64. Along the Parkway are two at-grade intersections for this segment, both of which can be upgraded to full folded-diamond interchanges in the future if traffic counts warrant an upgrade. Phase one included four bridges and cost an estimated $50 million to construct.

In 1998, another five miles (8 km) of the Industrial Parkway was constructed. This extended the Parkway from the end of phase one to Culp Creek Road, and opened in late-2001 to local traffic and officially opened in early 2002. Extending the progression of the highway northward, the third phase opened to traffic in the fall of 2002. Construction began in early-2001 and included a bridge over a small tributary and a folded-diamond interchange with KY 207.

The final phase extends from the KY 207 interchange to US 23. Construction began on this segment in early-2002 with work being completed by September 2003, a year ahead of schedule. The northern terminus junctions US 23 at a traffic signal and actually continues northward .1 of a mile north to KY 3105 (old US 23). It was given the designation of KY 67 at the dedication ceremony. Since being completed, the Industrial Parkway has saved over 30 minutes of travel between Greenup and Grayson on the curvy and dangerous KY 1. In 2004, the State Primary designation was moved from KY 1 to KY 67. The road also provides access to the EastPark industrial complex near Interstate 64.

Major intersections

CountyLocationmikmDestinationsNotes
Carter I-64 Ashland, LexingtonI-64 exit 179
GreenupEastpark Drive to Logtown Road - Eastpark Business / Industrial Park, Kentucky Veterans Cemetery North Eastinterchange
Boyd
No major junctions
GreenupTechnology Drive / Green Valley Drive - Ashland Community & Technical College Technology Drive Campus, Fivco Area Development District Office
Brush Creek Road
Sandsuck Creek / Lost Lick Road
to Culp Creek Roadinterchange
to Pleasant Valley Roadinterchange
Woods-Sullivan Cemetery Road
KY 207 Argillite, Flatwoods - Greenbo Lake State Resort Parkinterchange
to Horn Hollow Roadinterchange
Wurtland US 23 Greenup, Ashland
KY 3105 Wurtland
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. "Kentucky Transportation Cabinet - Division of Planning - Highway Information System Official Milepoint Route Log Extract". Archived from the original on 2007-04-30. Retrieved 2007-04-08.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.