Kanti Thermal Power Station

Kanti Thermal Power Station
Official name Muzaffarpur Thermal Power Station, MTPS/KBUNL/GFTPS
Country India
Location Kanti, Bihar
Coordinates 26°04′N 85°14′E / 26.07°N 85.24°E / 26.07; 85.24Coordinates: 26°04′N 85°14′E / 26.07°N 85.24°E / 26.07; 85.24
Status Operational
Commission date 1985
Owner(s) NTPC and BSPHCL or BSEB
Operator(s) Kanti Bijlee Utpadan Nigam Ltd. (KBUNL)
Thermal power station
Primary fuel Coal
Power generation
Units operational

2 X 110 MW +

2 X 195 MW
Make and model BHEL
Nameplate capacity 610 MW
7 MW ( approx)

Kanti Thermal Power Station also known as George Fernandes Thermal Power Plant Station(GFTPS)[1][2] is located in Kanti, Muzaffarpur,90 km away from Patna, the capital of the Indian state of Bihar.[3] It is managed by the Kanti Bijlee Utpadan Nigam Ltd. (KBUNL), a joint venture between NTPC and BSEB Patna.[4] The majority shares of the Joint Venture Company are held by NTPC,with NTPC 64.57% and BSEB 35.43%.The plant was not been functional between 2003 and 2013,however renovation of both older units paved the way for commercial production of electricity by the end of 2013.[5]

In November 2013, Chief Minister Nitish Kumar said that another new 500MW power plant will be set up at Kanti. The first 195 MW unit was commissioned by BHEL at the 2x195 MW plant in March 2015.[6][7]

The second unit of the 2 X 195 MW was commissioned on 13 June 2016. Muzaffarpur Thermal Power Station is currently having an installed capacity of 610 MW. Another 500 MW extension have been planned. East Central Railway will provide uninterrupted supply of coal to thermal power station.[8] The electrification work between Kaparpura and Kanti stations will be completed.

History

First started in 1985 ,Kanti Power Plant had an initial installed capacity of 110×2 MW. An additional capacity of 195×2 MW was erected in 2015-16. Kanti thermal Power Plant came into existence with the efforts of then MP of Muzaffarpur, George Fernandes.[9][10][11] The construction of the plant began during George's first tenure as MP of Muzaffarpur in 1978.[12] In November 2014, Kanti plant was renamed as George Fernandes Thermal Power Plant to acknowledge his contribution.[13][14] To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named ‘Vaishali Power Generating Company Limited (VPGCL)’ with NTPC on 06/09/2006,-contributing 51% of equity; and the balance equity was contributed by Bihar State Electricity Board. The company was rechristened as ‘Kanti Bijlee Utpadan Nigam Limited’ on April 10, 2008.[15][16] Present equity holding is 64.57% by NTPC & 35.43% by BSEB. The company renovated and modernized the existing unit.The total cost of its renovation and modernization has been over Rs. 500 Crores.

In March 2013, the renovation work of two old units was completed.MTPS started commercial production from November 1, 2013 by sypplying 94 MW. This is first generation in 11 years since 2002.[17] On 17 April 2018, Bihar state cabinet , headed by chief minister Nitish Kumar, gave its nod to handing over of Kanti Thermal Power Station to National Thermal Power Corporation.[18] On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease.[19][20][21]

Capacity

StageUnit NumberInstalled Capacity (MW)Date of CommissioningStatusNotes
Stage-11110March 1985, recommissioned November 2013OperationalThis unit went down in 2003 and then its renovation started by Bharat Heavy Electricals in April 2008 and is now running at full capacity since November 2013 [22]
Stage-12110March 1986, recommissioned November 2014OperationalThis unit too is non functional since 2003 and was also renovated by Bharat Heavy Electricals.[23] But, since 14 November 2014 this unit has been functional after the renovation and modernisation work.[24][25]
Stage-231955 May 2015OperationalThe original planned capacity of the unit was 250 MW but was reduced to 195 MW Scheduled after Airport Authority of India raised concern over its chimney height.[26]

Bhel commissioned the first 195MW unit at Muzaffarpur Thermal Power Station in India on 5 May 2015. The commissioning is the first of the two units at 390MW Muzaffarpur Thermal Power Station (TPS).[27]

Stage-2419513 June 2016OperationalOriginal planned capacity was 250 MW but reduced to 195 MW.[28] Total installed capacity becomes 610 MW.
Total610

See also

References

  1. "Nitish vocal tonic to counter BJP claims".
  2. Jha, Giridhar (2014-11-15). "Nitish left out in the cold for opening of power project on his home turf | Daily Mail Online". Dailymail.co.uk. Retrieved 2016-08-07.
  3. Pranava K Chaudhary (2014-01-30). "Bihar to get 5k MW by 2015 - Times of India". Timesofindia.indiatimes.com. Retrieved 2016-08-07.
  4. "Kanit, Barauni power plants to be ready by December". Business Standard. 2013-03-31. Retrieved 2013-11-05.
  5. "Trial Run Successful at renovated Kanti Thermal Power Station". Retrieved 22 August 2013.
  6. "BHEL commissions 195-MW thermal power unit in Bihar".
  7. 13:51 2015. "BHEL gains 2.5%, commissions 195 MW thermal unit in Bihar". StocksMarket.in. Retrieved 2016-08-07.
  8. "Railways assures NTPC of uninterrupted coal supply".
  9. "Barh, Karanpura projects leave questions unanswered - Times Of India". Articles.timesofindia.indiatimes.com. Retrieved 2013-11-05.
  10. TNN Apr 25, 2004, 03.30am IST (2004-04-25). "George hopes for a smooth comeback - Times Of India". Articles.timesofindia.indiatimes.com. Retrieved 2013-11-05.
  11. "The Telegraph - Calcutta : Nation". Telegraphindia.com. 2004-04-26. Retrieved 2013-11-05.
  12. "Leading by example".
  13. "Kanti's 110MW second unit starts power generation".
  14. "Key Contests: George Fernandes vs Bhagwan L Sahni | Business Standard News". Business-standard.com. Retrieved 2016-08-07.
  15. "NTPC to take over Kanti, Nabinagar JV plants for Rs3,000 crore".
  16. "NTPC to take over Kanti, Nabinagar JV plants".
  17. Anand Raj (1999-03-01). "Power trickle boost to energy". Telegraphindia.com. Retrieved 2013-11-05.
  18. "Patna to hand over 3 power plants to NTPC".
  19. "State happy with power deal".
  20. "Bihar transfers 3 power plants to NTPC on lease for 30 years".
  21. "NTPC signs MoU with Government of Bihar; aims to improve performance of Power Sector in Bihar".
  22. Share on Twitter (2013-11-18). "500MW power plant at Kanti soon: Nitish - Times of India". Timesofindia.indiatimes.com. Retrieved 2016-08-07.
  23. Anand Raj (2013-11-05). "Power trickle boost to energy". Telegraphindia.com. Retrieved 2016-08-07.
  24. Anand Raj (2014-11-09). "Baby steps to power target". Telegraphindia.com. Retrieved 2016-08-07.
  25. Share on Twitter (2014-11-15). "Kanti's 110MW second unit starts power generation - Times of India". Timesofindia.indiatimes.com. Retrieved 2016-08-07.
  26. http://bsphcl.bih.nic.in/B-Projects.htm
  27. http://www.power-technology.com/news/newsbhel-commissions-195mw-unit-at-muzaffarpur-thermal-power-station-in-bihar-india-4568686%5Bunreliable+source?%5D
  28. "BHEL commissions 195 MW unit at Muzaffarpur plant". Moneycontrol.com. 2016-06-14. Retrieved 2016-08-07.