Jura Foot Railway

Jura Foot Railway
ICN running near Twann
Overview
Termini Olten
Geneva
Technical
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 15 kV/1623 Hz AC overhead catenary
Route map

from Basel and Aarau
39.2
Olten
396 m asl
Aare bridge, Olten Hammer (135 m)
40.6
Olten Hammer
403 m asl
43.0
Wangen bei Olten
417 m. asl
45.3
Hägendorf
427 m asl
49.1
Egerkingen
435 m asl
51.4
Oberbuchsiten
442 m asl
OeBB from Balsthal–Klus
56.6
Oensingen
462 m asl
58.8
Niederbipp
468 m asl
Aare bridge, Wangen (96 m)
64.3
Wangen an der Aare
422 m asl
67.6
Deitingen
429 m asl
70.3
Luterbach-Attisholz
429 m asl
narrow gauge line to Bern
73.8
Solothurn
431 m asl
narrow gauge line to Niederbipp
to Burgdorf
closed line to Lyss
Aare bridge at Solothurn (104 m)
74.7
Solothurn West
432 m asl
to Moutier (BLS)
75.7
Solothurn Allmend
443 m asl
76.7
Bellach
443 m asl
77.6
Bellach
429 m asl
80.6
Selzach
438 m asl
82.8
Bettlach
440 m asl
85.3
Grenchen Süd
440 m asl
Mösli viaduct (285 m)
88.0
Jura line from Basel
88.0
Lengnau
439 m asl
90.2
Pieterlen
435 m asl
94.0
Biel/Bienne
Bözingenfeld
/Champs-de-Boujean
444 m asl
95.8
Biel Mett
443 m asl
98.0
to Bern
narrow gauge line to Ins
99.4
104.5
Biel/Bienne
437 m asl
to La Chaux-de-Fonds
Vingelz tunnel (2432 m)
99.8
Tüscherz
434 m asl
96.0
Twann
433 m asl
94.0
Ligerz
434 m asl
90.0
La Neuveville
433 m asl
87.7
Le Landeron
437 m asl
85.5
Cressier NE
436 m asl
83.6
Cornaux
435 m asl
St-Blaise tunnel (155 m)
85.5
Saint-Blaise CFF
464 m asl
from Bern (BLS)
75.3
Neuchâtel
479 m asl
73.6
to La Chaux-de-Fonds
Route-de-France tunnel (58 m)
72.3
Neuchâtel-Serrières
437 m asl
70.3
Auvernier
492 m asl
to Pontarlier
67.6
Colombier NE
490 m asl
66.3
Boudry
491 m asl
62.3
Bevaix
489 m asl
58.1
Gorgier-St-Aubin
451 m asl
beginning of rebuilt line
St-Aubin-Sauges tunnel (2252 m)
54.8
Vaumarcus
447 m asl
La Raisse tunnel (1245 m)
Fin-de-Lance tunnel (286 m)
50.7
Concise
430 m asl
Concise tunnel (365 m)
end of rebuilt line
47.5
Onnens-Bonvillars
435 m asl
42.7
Grandson
437 m asl
Thièle bridge, Yverdon (79 m)
39.1
Yverdon-les-Bains
434 m asl
to Payerne
32.7
Ependes
440 m asl
29.6
Essert-Pittet
438 m asl
27.4
Chavornay
447 m asl
24.9
Bavois
442 m asl
Nord-de-Mormont tunnel (182 m)
Sud-de-Mormont tunnel (302 m)
21.4
Éclépens
455 m asl
20.2
industrial siding
19.3
Daillens
445 m asl
19.0
to Swiss Post logistics centre
19.0
from Swiss Post logistics centre
14.4
Cossonay
funicular to Gare–Ville
428 m asl
11.0
Vufflens-la-Ville
406 m asl
10.0
industrial siding
6.9
14.9
Bussigny
407 m asl
Poimboeuf bridge (
right: 64 m
left: 71 m
)
Poudrière III bridge (216 m)
13.2
7.3
Lécheires
yard
Larges-Pièces bridge (106 m)
4.5
Renens
416 m asl
0.0
Lausanne
447 m asl

The Jura foot railway (French: ligne du Pied-du-Jura, German: Jurafusslinie) or Jura south foot line in Switzerland runs from Olten along the foot of the southern Jura range through Solothurn, Grenchen, Biel/Bienne, Neuchâtel Yverdon-les-Bains and Morges to Geneva. It is one of two routes used by intercity trains between Geneva and Zürich. The other is the Midland line (German: Mittellandlinie) which connects Olten via Langenthal, Burgdorf, Bern, Fribourg, Lausanne to Morges. The line was built by five railway companies, which after several mergers were absorbed into the Swiss Federal Railways in 1903.

The line is electrified at 15 kV 16.7 Hz AC and is two track almost throughout.

History

ICN above Lake Neuchâtel, near Vaumarcus
ICN near Essert-Pittet

The Jura foot line was built in several stages. The oldest part are the sections opened by the West Switzerland Company (French: Compagnie de l'Ouest-Suisse, OS) in May 1855 from Yverdon-les-Bains to Bussigny-près-Lausanne and in July 1855 from Bussigny to Morges via Renens. On 5 May 1856, the company opened two new sections, Renens to Lausanne and the connecting curve from Morges to Bussigny. The OS opened a line from Morges to Coppet on 14 April 1858 and a line from Coppet to Versoix on the following 21 April. On 25 June 1858 the OS connected with Geneva with the opening of the Versoix–Geneva route of the Geneva–Versoix Railway (French: Chemin de fer Genève–Versoix, GM). In 1859 it opened the section from Yverdon to Vaumarcus.[1][2] On 7 November 1859 the Franco–Swiss Company (French: Compagnie Franco-Suisse, LFB) opened an extension from Vaumarcus to the village of Frienisberg, near Le Landeron on Lake Biel. A temporary station was established at a pier in Frienisberg for a link by boat across Lake Biel to a station at Nidau near Biel built by the Swiss Central Railway (German: Schweizerische Centralbahn, SCB).[1][2][3]

From the other direction in 1857 the SCB opened the line from Olten via Herzogenbuchsee to Solothurn and along the current route to Biel south of Solothurn. This route avoided having to cross the Aare river between Olten and Solothurn, but is longer than the route opened in 1876. In 1858 the SCB built a short line from Biel station to Nidau on Lake Biel, from where a connection by ship over Lake Biel was opened in 1859 to the temporary station at Frienisberg. The gap along the northern shore of Lake Biel from Biel to Landeron was closed on 3 December 1860 by the Swiss East–West Railway (German: Schweizerische Ostwestbahn, OWB). As a result, the short line from Biel to Nidau closed on 10 December 1860. It was now possible for the first time to travel from the east of Switzerland at St. Margrethen to its west at Geneva by train, although the different railway companies involved meant that several changes of train were necessary.

The last section of the Jura foot line to be completed was the section from Olten to Solothurn via Oensingen opened on 4 December 1876 by the SCB, also called the Gäu railway (German: Gäubahn). This was originally planned as part of the Swiss National Railway's proposed line from Lake Constance to Lake Geneva. The line from Herzogenbuchsee to Solothurn became a local railway after it was bypassed by the Gäu railway. As part of Rail 2000, the line and its stations at Derendingen, Subingen, Etziken and Inkwil were closed in 1992 and most of it was rebuilt as a connecting line without stations for high-speed passenger trains from Solothurn to the Mattstetten–Rothrist new line, connecting at a junction at Wanzwil and opened on 12 December 2004. Under the Rail 2000 program, a winding single-track section along the shore of Lake Neuchâtel between Gorgier-St-Aubin and Concise was replaced by a double track section mostly in tunnel, which was opened in 2000.

References

  1. 1 2 Ein Jahrhundert Schweizer Bahnen (A century of Swiss railways) 1847–1947 (in German). I. Frauenfeld: Verlag Huber & Co. AG. 1947. pp. 79–80.
  2. 1 2 Wägli, Hans G. (1980). Schienennetz Schweiz (Swiss rail network) (in German). Bern: Swiss Federal Railways.
  3. 3 x 50 Jahre - Schweizer Eisenbahnen in Vergangenheit, Gegenwart und Zukunft (3 x 50 years: Swiss railways in the past, present and future) (in German). Basel: Pharos-Verlag. 1997. pp. 71–73.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.