Mumbai CST - Howrah Duronto Express

Mumbai CST - Howrah Duronto Express
Overview
Service type Duronto Express
Locale Maharashtra, Chhattisgarh, Orissa, Jharkhand & West Bengal
First service September 29, 2009 (2009-09-29)
Current operator(s) South Eastern Railway zone
Route
Start Chhatrapati Shivaji Terminus
End Howrah Junction
Distance travelled 1,968.227712 km (1,223.000000 mi)
Average journey time 12261 - 26 hours, 35 minutes
Service frequency Four times a week
Train number(s) 12261 / 12262
On-board services
Class(es) AC 1st Class, AC 2 Tier, AC 3 Tier
Seating arrangements No
Sleeping arrangements Yes
Catering facilities Yes
Technical
Rolling stock WAP 4 (HWH/SRC)
Operating speed 74.029824 km/h (46 mph) (Average Speed), including halts

Mumbai CST-Howrah AC Duronto Express is a Duronto Express train of plying in Mumbai-Howrah route via Nagpur.


Background

Being non-stop version of Rajdhani train, it takes least number of intermediate halts for technical purposes like crew change, loco change and also other reasons such as food pick-up, water-filling, etc.

Rake sharing

It shares rakes with Pune Howrah Duronto Express, which has same timetable or run between Manmad Junction and Howrah Junction.

12261 Howrah Duronto Express
Howrah Duronto Express with Santragachi WAP 4 Loco at Raigarh


Coach Composition

Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EOGA3A2A1H1PCB10B9B8B7B6B5B4B3B2B1EOG

12262 is the reverse composition of the above 12261.

B- Three Tier AC Sleeper/Third AC, A- Two Tier AC Sleeper/Second AC, H- AC First class cabins/First AC, PC-Pantry/Hot buffet car, EOG/GV-Generator van cum Guard van

Locomotive

It mostly gets WAP 4 loco of Howrah (ER) shed from Howrah Junction to Mumbai CST. Sometimes, it can also be seen with WAP 4 of Santragachi (SER) shed (Howrah - Mumbai CST). Recently, Mumbai 's lines conversion to AC has brought Howrah WAP 4 to and fro from and to Mumbai CST.

Before the conversion of Mumbai CST to Kasara from 1500 V DC to 25000 V AC, it was hauled by WCAM-3 of KYN shed for that section.

Technical Halts

12261 takes 2 technical halts at Kasara, Igatpuri, It takes about 7 mins at Kasara for addition of banker engine WAG 7 for the run through the ghats, Igatpuri of about 15 to 20 mins for the removal of bankers.

12262 takes No technical halts.

References


    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.