GO 59 Floating dock

History
Italy
Name: GO 59
Builder: Cantiere Navale Giacalone di Mazara del Vallo (Trapani)
Laid down: 2013
Launched: 2014
Acquired: 2011 for € (EUR) 7 millions.[1]
Commissioned: march 2014
In service: 1
Homeport: Brindisi[2]
General characteristics
Type: Floating dry dock
Length:
  • - 70.00 m (229 ft 8 in) LOA[3]
  • - working length = 60.00 m (196 ft 10 in)
Beam:
  • - 19.0 m (62 ft 4 in)
  • - working beam = 14.0 m (45 ft 11 in)
Draught: 8.0 m (26 ft 3 in) (max)
Draft: 9.5 m (31 ft 2 in) (max)
Propulsion:
Notes: lifting capability 1.000 t (0.984 long tons)

GO 59 is a Floating dry dock of the Marina Militare.[4]

History

Delivered to Arsenale Militare Marittimo di Augusta on 26 March 2014,[5][6] it was transferred to Stazione Navale di Brindisi on 24 February 2016.[7]
These are the technical specifications of MM for its realization.

References

  1. http://www.difesa.it/Amministrazionetrasparente/segredifesa/navarm/Documents/settembre2016/Delibere/Relazione_preliminare_CIG2300938A18_Contratto_20222.pdf
  2. http://www.marina.difesa.it/Notiziario-online/Pagine/2016_02_26_GO59.aspx
  3. http://www.marina.difesa.it/conosciamoci/organizzazione/comandienti/arsenali/marinarsen_augusta/Pagine/generalita_struttura.aspx
  4. "Naviglio locale – Marina Militare". Marina.difesa.it. Retrieved 2016-11-27.
  5. http://www.marina.difesa.it/conosciamoci/notizie/Pagine/20140326_bacinogo59.aspx
  6. https://rassegnastampamilitare.com/2014/03/11/marina-militare-mezzi-il-bacino-go59-arriva-ad-augusta/
  7. http://www.marina.difesa.it/Notiziario-online/Pagine/2016_02_26_GO59.aspx

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.