Fuzhou South railway station

Fuzhounan
福州南
Fuzhou South Railway Station on 2016-10-01
Other names Fuzhou South
Location Cangshan District, Fuzhou, Fujian
China
Operated by China Railway CR Nanchang
Fuzhou Metro Fuzhou Metro
Connections Bus terminal
History
Opened China Railway April 26, 2010
Fuzhou Metro May 18, 2016

Fuzhounan (Fuzhou South) Railway Station (Chinese: 福州南站; pinyin: Fúzhōu Nánzhàn; Foochow Romanized: Hók-ciŭ Nàng-chhám) is a metro station and a railway station located in Fuzhou, Fujian Province, China, along the Wenzhou-Fuzhou Railway and Fuzhou-Xiamen Railway operated by the Nanchang Railway Bureau, China Railway Corporation.

History

The station began construction on September 2, 2008[1] and opened on April 26, 2010.[2]

Services

China Railway

Fuzhounan
福州南
China Railway High-speed
Other names Fuzhou South
Location Cangshan District, Fuzhou, Fujian
China
Operated by Nanchang Railway Bureau,
China Railway Corporation
Line(s) Wenzhou–Fuzhou Railway,
Fuzhou–Xiamen Railway
Platforms 7
Connections
  • Bus terminal
History
Opened 2010

Fuzhounan railway station (Chinese: 福州南站) is a railway station in Cangshan District, Fuzhou, Fujian, China.

Fuzhou Metro

Fuzhou South Railway Station
福州火车南站
Fuzhou Metro
Location Cangshan District, Fuzhou, Fujian
China
Operated by Fuzhou Metro Co. Ltd.
Line(s)      Line 1
Platforms 2
Connections
  • Fuzhou South railway station China Railway China Railway High-speed
Construction
Structure type Underground
History
Opened May 18, 2016
Services
Preceding station   Fuzhou Metro   Following station
toward Xiangfeng
Line 1Terminus

Fuzhou South Railway Station (Chinese: 福州火车南站) is a terminus of Line 1 of the Fuzhou Metro. It is located on Lulei Road at the underground of CR railway station in Cangshan District, Fuzhou, Fujian, China.[3] This station started operation on May 18, 2016.[4]

Station layout

G Street level Exits
L1

Concourse Customer Service, Automatic Ticketing Machines
L2

Platforms

Platform 1 Line 1 towards Xiangfeng (Lulei)
Island platform, doors will open on the left
Platform 2 Line 1 Terminus Platform→
Source: [3]

Exits

Exit number Exit location
Exit A1 South of Yongnan Road, East of Lulei Road
Exit A2 South of Yongnan Road, East of Lulei Road
Exit B South of Yongnan Road, East of Lulei Road
Exit C South of Yongnan Road, East of Lulei Road
Exit D1 South of Yongnan Road, East of Lulei Road
Exit D2 South of Yongnan Road, East of Lulei Road
Exit E South of Yongnan Road, East of Lulei Road
Exit F South of Yongnan Road, East of Lulei Road
Source: [3]

See also

References

  1. 东南新闻网 福州火车南站今日动工(in Chinese)
  2. 福州火车南站4月26日正式投入运营(in Chinese)
  3. 1 2 3 "福州火车南站站". www.fzmtr.com. Retrieved 2016-07-08.
  4. "福州地铁1号线南段试运营 最高票价3元". finance.ifeng.com. Retrieved 2016-07-08.

Coordinates: 25°59′11″N 119°23′25″E / 25.98625°N 119.39037°E / 25.98625; 119.39037


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.