Line 4 (Fuzhou Metro)
Line 4 | |||
---|---|---|---|
Overview | |||
Type | Rapid transit | ||
System | Fuzhou Metro | ||
Status | Planned | ||
Locale | Fuzhou, China | ||
Termini |
Huaxi North Road Luozhou | ||
Stations | 22 (Phase 1) | ||
Services | 1 | ||
Operation | |||
Opened | 2023 (scheduled) | ||
Owner | City of Fuzhou | ||
Operator(s) | Fuzhou Metro Co., Ltd. | ||
Character | Underground | ||
Technical | |||
Line length | 26.9 km (16.71 mi) | ||
Number of tracks | 2 | ||
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) | ||
Electrification | Third rail, 1,500 V DC | ||
|
Line 4 of the Fuzhou Metro (Chinese: 福州地铁4号线; pinyin: Fúzhōu Dìtiě Sì Hào Xiàn) runs from Cangshan District to Cangshan District. It starts at Huaxi North Road and ends at Luozhou. The total length is 26.9 km. Line 4's color is orange. This line was scheduled to begin the construction in 2017 and end in 2021.
Stations
Phase 1 Station:[1]
- Luozhou (Transfer Line 5)
- Chengmen (Transfer Line 1)
- Qianjiangcun (There is a Jinjizhui Depot)
- Linpu
- Exhibition Center (Transfer Line 6)
- Jiangbiancun
- Aofeng Road
- Yuanyang Road
- Qianyu (Transfer Line 2)
- Fuxin East road
- Huagong Road
- Chibian
- Yuefeng Town North
- Tatou
- Shengli Hospital
- Dongjiekou
- Baima North Road
- West No.2 ring Road
- Gongye Road (The North gate of Fuzhou University)
- Yangqiao West Road
- Hongtang Road (Transfer Line 5, There is a Hongtang Parking.)
- Huaxi North Road
References
- ↑ "福建招标与采购网-福州市轨道交通4号线一期工程(勘察、设计)". www.fjbid.gov.cn (in Chinese). Fujian Provincial Development and Reform Commission. Retrieved 8 February 2017.
This article is issued from
Wikipedia.
The text is licensed under Creative Commons - Attribution - Sharealike.
Additional terms may apply for the media files.