Deer Park–West Werribee railway line

Deer Park–West Werribee
Overview
Status Operational
Locale Melbourne, Victoria, Australia
Termini Deer Park
Little River
Stations 4
Services
Operation
Commenced 2012 (2012)
Opened 21 June 2015 (2015-06-21)
Completed 2014 (2014)
Owner VicTrack
Operator(s) V/Line
Technical
Line length 28 km (17 mi)
Number of tracks 2
Track gauge 1,600 mm (5 ft 3 in)
Electrification 1500 V DC overhead
Route map

km
Deer Park
Tarneit
Wyndham Vale
Little River

The Deer Park – West Werribee railway line is on the western fringes of the metropolitan area of Melbourne, Victoria, and is part of the Regional Rail Link. It was constructed between 2012 and 2015.[1]

History

The Deer Park – West Werribee railway line was built as part of the Regional Rail Link project that aimed to increase rail capacity by segregating regional and suburban passenger services in Melbourne. The line runs from three kilometres west of Deer Park railway station, on the Serviceton line, to Manor junction on the Warrnambool line. The double-track line includes new stations at Tarneit and Wyndham Vale. Geelong-Melbourne rail services run via the new route and so no longer have to share tracks with Werribee line services run by Metro Trains. However, trains on the route effectively provide a suburban service for Wyndham Vale and Tarneit residents.

Test trains began operating in October 2014 and passenger services started on 21 June 2015.[2][1]

References

  1. 1 2 "Milestones". Regional Rail Link. Archived from the original on 2015-06-17. Retrieved 2017-07-06.
  2. Lucas, Clay (2014-10-09). "First major Melbourne rail line in 80 years still six months off". The Age. Retrieved 2017-07-06.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.