Clark/Division station

Clark/Division
 
1200N
100W
Location 1200 North Clark Street
Chicago, Illinois 60610
Coordinates 41°54′14″N 87°37′53″W / 41.90392°N 87.631412°W / 41.90392; -87.631412
Owned by City of Chicago
Line(s)
Platforms 1 island platform
Tracks

2

Depth 26 ft
Construction
Structure type Subway
Bicycle facilities Yes
Disabled access Yes
History
Opened October 17, 1943
Rebuilt 201215 (station renovation)
Traffic
Passengers (2017) 2,630,294[1]Decrease 4.3%
Rank 16 out of 143
Services
Preceding station   Chicago "L"   Following station
State Street Subway
toward Howard
Red Line
Red Line
Rush period special
toward Ashland/63rd
Route map

Division St.
Red Line
west to Howard
LaSalle St.
Clark St.
Red Line
east to 95th/Dan Ryan
Location

Clark/Division (read as Clark and Division) is an 'L' station on the CTA's Red Line. It is a subway station with one island platform, located at 1200 North Clark Street, in the Near North Side neighborhood of Chicago, between the Gold Coast and Old Town. Much of Chicago's North Loop nightlife, including the Rush St. district and many bars and nightclubs are located close to the station.

History

Structure

Clark/Division station is in the State Street subway, which opened on October 17, 1943. From Clark/Division northbound trains travel west along Division Street, turning northwest at Clybourn Avenue to North/Clybourn station, a distance of about 1 14 miles (2.0 km) to the northwest. Southbound trains turn south to follow State Street to Chicago station, about 12 mile (0.80 km) to the south.

Platform

Clark/Division is the only station in the State Street Subway north of the loop to have an island platform; all of the other stations in the subway north of the loop use side platforms. The station also still has its original illuminated type station signs, hanging from the center of the ceiling on the platform.

Renovation

On September 10, 2012, a renovation project began at the station and ended on September 29, 2015.[2] The renovation project made the station ADA accessible and provided new art features, bike racks, new signage, granite floors and stairs. The new LaSalle mezzanine and entrances opened at 5:00 a.m. on June 30, 2014. The station remained open during the project.[3] The renovation has a projected cost of $50 million.[4] The renovation of the Clark mezzanine and entrances was completed on September 29, 2015.[5]

Bus connections

CTA

  • 22 Clark (Owl Service)
  • 36 Broadway
  • 70 Division

Notes and references

Notes

    References

    1. "Annual Ridership Report Calendar Year 2017" (PDF). Chicago Transit Authority, Ridership Analysis and Reporting. January 31, 2018. Retrieved July 29, 2018.
    2. https://www.transitchicago.com/mayor-emanuel-announces-completion-of-clarkdivision-red-line-station-renovation/?Month=9&Year=2015
    3. "Renovation of Clark/Division". Chicago Transit Authority. transitchicago.com. Retrieved November 27, 2012.
    4. Hilkevitch, Jon (February 1, 2015). "Where are the Chicago-area construction projects in 2015?". The Chicago Tribune. Retrieved April 24, 2015.
    5. "Mayor Emanuel Announces Completion of Clark/Division Red Line Station Renovation". City of Chicago. September 29, 2015. Retrieved September 29, 2015.
    Staircase entrance to the station, October 2009, prior to renovation
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.