Bloomington GO Station

Bloomington
Location Bloomington Road & Highway 404,
Oak Ridges, Ontario
Coordinates 43°58′33″N 79°23′50″W / 43.97583°N 79.39722°W / 43.97583; -79.39722Coordinates: 43°58′33″N 79°23′50″W / 43.97583°N 79.39722°W / 43.97583; -79.39722
Owned by Metrolinx
Construction
Parking 1050 spaces
Bicycle facilities Bike shelters with platform access
Other information
Fare zone TBA
History
Opening 2019
Services
Preceding station   GO Transit   Following station
Richmond Hill
Opening 2019
Terminus

Bloomington GO Station is a train and bus station under construction in the GO Transit network located in the extreme northeast corner of Richmond Hill, Ontario, Canada, serving Oak Ridges and the town of Whitchurch–Stouffville. It will become the new terminus of the Richmond Hill line train service when its construction is completed in 2019.[1][2] Construction of the station began in March 2017,[2] a few months after the completion of the Gormley GO Station which opened in December 2016.[1]

The station, consisting of a single platform, building, bus loop, kiss and ride, and up to 1,000 parking spaces, will be located on the south side of Bloomington Road (York Regional Road 40), on the east side of the Canadian National Railway line and west of Highway 404.[3][4] Land will also be reserved for a future carpool parking lot managed by the Ministry of Transportation of Ontario.[4]

The station site will cost $82.4 million to develop,[2] and the multi-level parking structure and integrated station building will be built to satisfy LEED Gold certification.[5]

References

  1. 1 2 "Expansion Projects". GO Transit. Retrieved 2011-03-23.
  2. 1 2 3 Zarzour, Kim (24 March 2017). "New GO station extends Richmond Hill line to Bloomington and Highway 404". Richmond Hill Liberal. Retrieved 2017-07-17.
  3. "Richmond Hill Layover Facility EA and Preliminary Design" (PDF). AECOM Canada Ltd. August 2009. Retrieved 2011-03-23.
  4. 1 2 "Richmond Hill GO line". Metrolinx. Retrieved 1 February 2017.
  5. "Construction begins for York Region GO station". Daily Commercial News. DCN News Service. 4 April 2017. Retrieved 29 December 2017.
  • Bloomington GO Station construction at GO Transit
  • IBI Group (November 2016). "Environmental Study Report Addendum - Bloomington GO Station" (PDF). Metrolinx. Retrieved 2017-07-17.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.