Battery electric multiple unit

A battery electric multiple unit, battery electric railcar or accumulator railcar is an electrically driven multiple unit or railcar whose energy is derived from rechargeable batteries that drive its traction motors.

The main advantage of these vehicles is that they do not use fossil fuels like coal or diesel fuel, emit no exhaust gases and do not require the railway to have expensive infrastructure like electric ground rails or overhead catenary. On the down side is the weight of the batteries, which raises the vehicle weight, and their range before recharging of between 300 and 600 kilometres (186 and 373 mi). Currently, battery electric units have a higher purchase price and running cost than petrol or diesel railcars, needing one or more charging stations along the routes they operate.

Battery technology has greatly improved over the past 20 years broadening the scope of use of battery trains, moving away from limited niche applications. Despite higher purchase and running costs, on certain railway lines battery trains are economically viable as the very high cost and maintenance of full line electrification is eliminated. From March 2014 passenger battery trains have been in operation in Japan on a number of lines. Austria and New Zealand have ordered overhead wire/battery trains which will be operational in 2019.[1][2] Britain successfully trialled fare paying passenger hybrid overhead wire/lithium battery trains in January and February 2015.[3]

History

Experiments with accumulator railcars, as they were originally called, were conducted from around 1890 in Belgium, France, Germany and Italy. In the USA, railcars of the Edison-Beach type, with nickel-iron batteries were used from 1911. In New Zealand, a battery-electric Edison railcar operated from 1926 to 1934. The Drumm nickel-zinc battery was used on four 2-car sets between 1932 and 1946 on the Harcourt Street Line in Ireland and British Railways used lead-acid batteries in a railcar in 1958. Between 1955 and 1995 Deutsche Bahn railways successfully operated 232 DB Class ETA 150 railcars utilising lead-acid batteries.

Supercapacitors

Siemens Avenio trams have supercapacitor versions

A number of tramway manufacturers are offering battery tramcars that combine the traction battery with a supercapacitor that will be charged at each stop. The main motivation for the usage of battery-powered tramways is to avoid overhead wires across a city. Using boost charging at each stop allows to lower the size of the required traction battery. This technology is hoped to be transferred to full trains.

The CAF Urbos 3 tramways was ordered for the Seville metro with the Acumulador de Carga Rápida system which uses short overhead wires at each stop for charging. The Seville trams have been operating since Easter 2011.[4]

Siemens three car trams are to be used for Education City in Doha, the capital of Qatar.[5][6] The opening was scheduled for autumn 2015[6] but has been delayed until 2019.[5] No overhead wires will be installed, as the 10 Avenio trams will be powered by the Siemens Sitras HES system (Hybrid Energy Storage), a combination of a supercapacitor and a traction battery that will be charged at each stop through an overhead conductor rail.[6][7][8]

A Combino tramway using four car tramsets equipped with the Sitras HES system has been in regular service from Almada to Seixal, Portugal, since November 2008. It is capable of running up to distances of 2,500 metres without overhead wires.[9][10]

The 20.3km Huai'an tram line in China, opened in February 2016. The line is entirely catenary-free utilising battery-powered trams supplied by CRRC Zhuzhou which recharge at tram stops.[11]

By country

Austria

The Austrian Federal Railways has purchased at a cost of $1.9 billion 300 Bombardier Talent 3 trains,[12] the battery/electric version of the Talent 2 equipped to operate with batteries and overhead wires. The trains are to be used on regional and suburban rail on electrified and unelectrified track. The services are to commence in 2019.[13]

Germany

Railcar no. 517 008 of the German national railway, DB

In 1887 the first German accumulator railcars were placed in service by the Royal Bavarian State Railways. Their development continued with the pre-Second World War classes ETA 177 to 180, the post-war DB Class ETA 176 and finally ended with DB Classes 150, 515 and 517. The latter were used until 1995 having been since modernised into the Nokia ETA, painted light grey and green and deployed onto the so-called Nokia Railway (timetable number RB 46), nowadays the Glückauf-Bahn from Gelsenkirchen via Wanne-Eickel to Bochum.

Ireland

In the 1930s an experimental battery electric train ran successfully at Bray. The train's batteries were charged at each station via an overhead pickup. The train reached 60 mph. [14]

Japan

NE Train Smart Denchi-kun

In Japan, JR East tested a "NE Train Smart Denchi-kun" battery electric railcar from 2009. This vehicle is capable of operating under 1,500 V DC overhead wires or on battery power alone for a distance of up to 50 km away from an overhead power supply.[15] The batteries are charged via the pantograph either when running under an overhead electric supply or at a specially built recharging facility.[15][16]

EV-E301 series

From March 2014, a two-car battery electric multiple unit, the EV-E301 series with 1,500 V DC overhead wire and battery power capability, entered revenue-earning service on the 20 km (12 mi) long non-electrified Karasuyama Line.[17]

BEC819 series

From April 2016, JR Kyushu started trial operation of a two-car BEC819 series BEMU train, nicknamed "DENCHA", on part of the Chikuhō Main Line, with revenue-earning service scheduled from October of the same year, and six more trains planned to be introduced on the line in spring 2017.[18] It can also be powered via overhead AC power line. The BEC819 series battery/electric trains became operational on the through services on the Fukuhoku Yutaka Line in October 2016, which is electrified at 20 kV AC and the non-electrified Chikuhō Main Line, known as the "Wakamatsu Line", between Orio and Wakamatsu.[19]

EV-E801 series

A new EV-E801 series two-car BEMU train was introduced on the 26.6 km (16.5 mi) long non-electrified Oga Line in Akita Prefecture in March 2017. This differs from the earlier EV-E301 series train in being recharged from a 20 kV AC overhead supply instead of a 1,500 V DC overhead supply.[20]

New Zealand

Auckland Council has purchased 17 battery/electric trains from CAF in Spain, to operate between Britomart and Pukekohe. From Britomart the trains will operate on electric overhead wires to Papakura. From Papakura the trains will switch to battery mode for the journey to Pukekohe. Operation is to start in 2019.[21]

United Kingdom

Test Electrostar Train converted to run on batteries and overhead wires

Battery electric railcars used by British Rail included the British Rail BEMU and British Rail Class 419. The Class 419, operational from 1959 to 2004 could run either on batteries or a third rail being used for short unelectrified section on quaysides.

In 2015 a single Class 379 Electrostar, after electric lithium batteries were installed, began passenger operations on the Mayflower Line in Essex. The train can travel up to 60 miles (97 km) on energy stored in the batteries also recharging the batteries via the overhead-wires when on electrified sections of the line, at stations and via brake regeneration. The trial lasted one month from January to February.[22] Network Rail refer to this prototype model and its possible future descendants as Independently Powered Electric Multiple Units (IPEMU).[23]

A month after the trial in March 2015, the introduction of battery powered trains was proposed by Network Rail for consideration for the fifteen station Wrexham to Bidston, Birkenhead, Borderlands Line.[24] The aim is to connect the line onto the electric 3rd rail Merseyrail Wirral Line and extend into the underground section of Liverpool's city centre. The line is diesel train operated unable to progress into the electric 3rd rail underground Birkenhead and Liverpool Merseyrail metro tunnels. The diesel operated line terminates at Bidston railway station in Birkenhead, with passengers having to change trains at Bidston to proceed onto the Merseyrail electric network. Network Rail proposed using dual battery powered/3rd rail pickup rolling stock without full electrification of the 27 mile long line, providing a cheaper method of increasing connectivity into the electrified underground sections of the Birkenhead and Liverpool Merseyrail Wirral Line. If battery trains are introduced the Borderlands line will be incorporated into the Wirral Line becoming an urban metro line, in which trains only terminate at Wrexham running around the electrified Liverpool city centre underground tunnels in a loop.

Mark Carne of Network Rail in March 2017 stated: "The idea that you need to electrify an entire route is no longer necessarily the case. I think that where we have got hybrid trains, that opens up quite a lot of interesting opportunities for partial electrification." Carne also stated: "technology was advancing at such a pace that better reliability could be achieved without the construction of unsightly overhead cables." He added that developments in batteries are such that it might soon be cost effective to swap diesel engines for battery or hybrid devices, therefore saving the vast cost of installing power lines above every section of track.[25]

On page 37 of the Liverpool City Region Combined Authority, Long Term Rail Strategy document of October 2017, it states that in 2020 a trial of new class 777 Merseyrail electric 3rd rail/battery trains will be undertaken in view to incorporate two stretches of unelectrified track onto the Merseyrail network. The sections are on the Wirral Line from Ellesmere Port to Helsby interchange station and the Northern Line from Ormskirk to Preston interchange station.[26]

Class 230

Vivarail battery electric train

Vivarail are the first company to manufacture battery electric trains in the UK in the modern era. Their Class 230 is converted from redundant London Underground D-Stock trains and the second demonstrator unit, the two-car 230002, has been fitted for battery power in contrast to the diesel electric power of the earlier 230001 demonstrator unit. Vivarail claim that a ten-minute charge gives a range of 50 miles. Power is provided by two lithium ion batteries per car giving four per train, providing 106kWh, with an expected life of seven years for the batteries. The train is due to run on the national network in summer 2018.[27]

In 2017, Vivarail battery trains were being considered for use on the Valley Lines network in South Wales. The trains would be battery powered, capable of being recharged via 25kV OHLE.[28]

United States

The Edison-Beach battery railcar was developed by Thomas Edison and Ralph H. Beach. The latter headed the Railway Storage Battery Car Company and the Electric Car & Locomotive Corp.[29] Car No. 105 of the Alaska Railroad was an Edison-Beach car,[30] and examples operated on the Central Vermont Railway running between Millers Falls, Northfield and West Townshend. [31] A notable feature of the Edison-Beach cars was the Beach drive system. Each wheel was mounted on ball bearings on a dead axle and was driven by an individual traction motor through gearing.[32]

See also

References

  1. http://www.railway-technology.com/features/featurepowering-the-trains-of-tomorrow-5723499/
  2. http://www.railjournal.com/index.php/australia-nz/auckland-council-approves-order-for-caf-battery-electric-trains.html
  3. https://www.express.co.uk/news/uk/551880/Network-Rail-launches-first-battery-run-passenger-train-in-50-years
  4. Sevilla, Diario de. "Las catenarias del Metrocentro serán desmontadas este fin de semana de cara a la Semana Santa". Retrieved 10 December 2016.
  5. 1 2 "Qatar's first Education City tram rolls out". Railway Gazette International. 11 March 2015.
  6. 1 2 3 Qatar Foundation to get turnkey tram system from Siemens Siemens website, 30 July 2012
  7. "Bahnen auf dem neuesten Stand". Elektrische Bahnen (in German). 2012.
  8. "Press Releases". Retrieved 10 December 2016.
  9. "Press Releases". Retrieved 10 December 2016.
  10. "Press Pictures". Retrieved 10 December 2016.
  11. Saxena, Ankur. "Raising the Baar for battery-powered trains". Retrieved 10 December 2016.
  12. https://www.bombardier.com/en/transportation/products-services/rail-vehicles/commuter-and-regional-trains/talent-3.html
  13. http://www.railway-technology.com/features/featurepowering-the-trains-of-tomorrow-5723499/
  14. Pathé, British. "A Revolution Of Transport". Retrieved 10 December 2016.
  15. 1 2 「蓄電池駆動電車システム」の開発を進めています [Development of battery-powered train system] (PDF). JR East press release (in Japanese). Japan: East Japan Railway Company. 6 October 2009. Retrieved 6 November 2012.
  16. https://www.jreast.co.jp/e/development/tech/pdf_23/Tec-23-17-20eng.pdf
  17. "EV-E301系「ACCUM」が甲種輸送される" [EV-E301 series "ACCUM" delivered]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 22 March 2014. Retrieved 23 January 2014.
  18. "電気がない区間は蓄電池で走る 非電化区間の次世代車両「819系 DENCHA」、車両デザインをJR九州が発表". Retrieved 10 December 2016.
  19. JR九州 架線式蓄電池電車"DENCHA"今秋デビュー [JR Kyushu "DENCHA" battery train to debut this autumn]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing Co., Ltd. 29 January 2016. Retrieved 29 January 2016.
  20. JR東日本、男鹿線に蓄電池電車「EV-E801系」導入へ [JR East to introduce new EV-E801 series battery train on Oga Line]. Response (in Japanese). Japan: IID, Inc. 20 November 2015. Retrieved 21 November 2015.
  21. http://www.railjournal.com/index.php/australia-nz/auckland-council-approves-order-for-caf-battery-electric-trains.html
  22. Battery train trial service launched - Global Rail News. Retrieved 2015-01-14.
  23. "Batteries included: Prototype battery-powered train carries passengers for first time". Retrieved 10 December 2016.
  24. "Welsh route study - Long term planning - Network Rail". Retrieved 10 December 2016.
  25. Correspondent, Graeme Paton, Transport (25 March 2017). "Run trains on batteries, says Network Rail boss" via www.thetimes.co.uk.
  26. http://moderngov.merseytravel.uk.net/documents/s21686/Enc.%201%20for%20Updated%20Long%20term%20Rail%20Strategy.pdf
  27. https://www.railmagazine.com/news/network/vivarail-targets-summer-running-for-new-battery-unit
  28. "Vivarail D-Trains for Wales & Borders?". Today's Railways (192): 18. December 2017.
  29. "Railway Car Builders of North America". Retrieved 10 December 2016.
  30. "Alaska Railroad Photographs". Retrieved 10 December 2016.
  31. "Trial Trip Will Be Made On Friday". The Brattleboro Daily Reformer. Brattleboro, Vt. August 18, 1914. Retrieved January 13, 2018.
  32. Illingworth, T., Battery Traction on Tramways and Railways, Oakwood Press 1961, pp 15-16
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.