South Square of Chongqingbei Railway Station station

South Square of Chongqingbei Railway Station (simplified Chinese: 重庆北站南广场; traditional Chinese: 重慶北站南廣場; pinyin: Chóngqìng Běizhàn Nánguǎngchǎng), previously known simply as Chongqingbei Railway Station, is an interchange station on Line 3 (straddle beam monorail), Line 10 (heavy rail subway) and the Loop line (heavy rail subway) of Chongqing Rail Transit.

South Square of Chongqingbei Railway Station

重庆北站南广场
Station signage at Line 3's platform level
Other namesChongqingbei Railway Station (former name)
LocationChongqing North railway station, Yubei District, Chongqing
China
Operated byChongqing Rail Transit Co., Ltd.
Line(s)      Line 3
     Line 10      Loop line
Platforms6 platforms(2 side platforms and 2 island platforms)
Connections
  • South Square of Chongqing North Railway Station(South Square currently under refurbishment)
Construction
Structure typeBelow ground
Disabled accessYes
Other information
Station code0/15, 3/27, 10/12
History
OpenedSeptember 29, 2011 (Line 3)
December 28, 2018 (Line 10 and Loop line)
Previous namesChongqingbei Railway Station
Services
Preceding station   Chongqing Rail Transit   Following station
toward Yudong
Line 3
Longtousi Park
toward Liyuchi
Line 10
North Square of Chongqingbei Railway Station
toward Wangjiazhuang
Loop line
Yulu
toward Erlang

Located in Chongqing's Yubei District, it serves the nearby Chongqing North railway station. It opened with the first phase of Line 3 on September 29, 2011 as Chongqingbei Railway Station (simplified Chinese: 重庆北站; traditional Chinese: 重慶北站; pinyin: Chóngqìng Běizhàn).[1] On March 23, 2016, in anticipation of the opening of a second metro station just north of the same railway station, its name was changed to reflect its location serving the south square of the railway station.[2]

On December 28, 2017, Line 10 opened for passenger trial operations, however the Line 10 section of this station opened on December 28, 2018, exactly one year later than the other stations in the metro line's Phase I.[3]

The Loop line section of the station also opened on December 28, 2018.

Together the 3 lines(Line 3, Line 10 and the Loop Line) share the same concourse for entrance/exit and transfer while the Loop Line has one other concourse that solely serves Loop Line passengers.

Line 3 platform signage wall before and after the name change

Station Structure

Loop Line Platform

An island platform is used for Loop Line trains travelling in both directions.

To Loop Chongqing Library 0/15

Anti-Clockwise Loop
Island Platform

Doors open on the left

Clockwise Loop

0/15

To  Loop  Erlang

Line 3 Platforms

Platform Layout

There are two side platforms for Line 3 trains.

Side Platform Doors open on the right
To  3  Terminal 2 of Jiangbei Airport &  3A  3/27

3/27

To  3  Yudong
Side Platform Doors open on the right

Line 10 Platform

Platform Layout

An island platform is used for Line 10 trains travelling in both directions.

To  10  Liyuchi & Lanhualu

10/12

Island Platform

Doors open on the left

10/12

To  10  Wangjiazhuang

References

  1. 重庆轻轨三号线. Tencent (in Chinese). Retrieved 2018-01-05.
  2. 站名不再绕 3号线重庆北站将更名重庆北站南广场. Xinhuanet (in Chinese). 2016-03-23. Retrieved 2018-01-05.
  3. 轨道交通5号线一期北段、10号线一期12月28日开通试运营. Chongqing Metro (in Chinese). 2017-12-28. Retrieved 2018-01-05.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.