Rantarata

Rantarata (the Coastal Railway, Swedish: Kustbanan), is a railway running between the Helsinki Central railway station and the Turku railway station in Finland. Its first segment, linking Turku to Karis, was commissioned in 1895, and work began the following year. The Turku–Karis track was opened for temporary traffic on 1 April 1899 and for permanent use on 1 November 1899. The second part of the Rantarata, linking Karis to Helsinki, was approved in 1897 and opened for traffic in 19021903. "Rantarata" is Finnish for "coast track".

Rantarata
Overview
TerminiHelsinki Central
Turku Harbour
Stations28
Operation
Opened1902
Technical
Line length195.8 km (121.66 mi)
Number of tracksQuad (Helsinki–Leppävaara)
Double (Leppävaara–Kirkkonummi)
Single (Kirkkonummi–Turku)
Track gauge1,524 mm (5 ft)
Electrification25 kV @ 50 Hz
Operating speed120 to 200 km/h (75 to 124 mph)
Route map
Legend
{{Routemap title = inline=yes collapsible = no title-bg = map =

BOOT KHSTa~~197~~Turku Harbour \eABZg+l\exCONTfq~~ ~~ ~~Uusikaupunki BHF~~194~~Turku HST~~Kupittaa STR BHF~~138~~Salo CONTgq\ABZg+r\~~ ~~ ~~Hanko-Hyvinkää Line BHF~~87~~Karis \ABZgl\CONTfq~~ ~~ ~~Hanko-Hyvinkää Line HST~~Ingå HST~~Siuntio -startCollapsible-collapsed \BHF\~~   ~~Kirkkonummi HST~~Tolsa HST~~Jorvas HST~~Masala HST~~Luoma HST~~Mankki HST~~Kauklahti -endCollapsible- -startCollapsible-collapsed \BHF\~~   ~~Espoo HST~~Tuomarila HST~~Koivuhovi HST~~Kauniainen HST~~Kera HST~~Kilo vENDEa-SHI1+r vBHF~~Leppävaara vBHF-STR~~Mäkkylä vBHF-STR~~Pitäjänmäki vBHF-STR~~Valimo \vABZg+l-STR\CONTfq~~ ~~ ~~Vantaankoski vBHF~~Huopalahti vBHF-STR~~Ilmala SPLe -endCollapsible- \ABZg+l\CONTfq~~ ~~ ~~Kerava, Tampere \BHF\~~3~~Pasila KBHFe~~0~~Helsinki

The track was done to serve primarily in commuter traffic and was therefore laid out with many curves and as few tunnels and expensive earthworks as possible. This resulted in a series of corrections and straightening of curves, a work with began in the 1910s and continued all the way to the 1990s.

As a part of the original plan, all of the stations along the Rantarata featured wooden station houses designed by the architect Bruno Granholm. Over the years many of these wood station building had been dismantled to make way for newer structures, such as Leppävaara railway station in 1999. Some of the old buildings still remain, Kauniainen railway station being the most significant example.

The track between Helsinki and Kirkkonummi was upgraded with 25 kV AC railway electrification during the 1960s, being the first government-owned electrified railway line in Finland. Together with other improvements and maintenance, the Kirkkonummi–Karis track received its overhead lines in 1992. Coinciding with the purchase of VR Group's first VR Class Sm3 "Pendolino" high-speed trains, the remaining track between Karis and Turku Harbour was electrified in 1995, completing the route.

The passenger service to Uusikaupunki was cancelled in the early 1990s, while freight traffic continues through the port of Uusikaupunki. Work to electrify the line to Uusikaupunki scheduled to begin in 2019, leading to the possibility of passenger service being reinstated.[1]

References

Media related to Helsinki–Turku railway at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.