North-South Corridor (Ahmedabad Metro)
The North-South Corridor (Gujarati: ઉત્તર-દક્ષિણ કોરિડોર) of the Ahmedabad Metro is a metro route of mass rapid transit system in Ahmedabad, India. It consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). Complete line is elevated.
North-South Corridor ઉત્તર-દક્ષિણ કોરિડોર | |
---|---|
Overview | |
Type | Rapid Transit |
System | Ahmedabad Metro |
Status | Under Construction |
Locale | Ahmedabad |
Termini | APMC Motera Stadium |
Stations | 15 |
Operation | |
Opened | 2020 (expected) |
Operator(s) | Gujarat Metro Rail Corporation Limited |
Character | Elevated |
Rolling stock | Hyundai Rotem |
Technical | |
Line length | 18.87 km |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) (Standard gauge) |
Electrification | 25 kV 50 Hz AC Overhead catenary |
It will connect Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations.
List of stations[1]
Following is a list of stations on this route-
North-South Corridor | |||||||
---|---|---|---|---|---|---|---|
# | Station Name | Connections | Opening | Layout | |||
English | Gujarati | Hindi | |||||
1 | APMC | એ પી એમ સી | ए पी एम सी | None | Under construction | Elevated | |
2 | Jivraj Park | જીવરાજ પાર્ક | जीवराज पार्क | None | Under construction | Elevated | |
3 | Rajiv Nagar | રાજીવ નગર | राजीव नगर | None | Under construction | Elevated | |
4 | Shreyas | શ્રેયસ | श्रेयस | None | Under construction | Elevated | |
5 | Paldi | પાલડી | पालड़ी | None | Under construction | Elevated | |
6 | Gandhigram | ગાંધીગ્રામ | गाँधीग्राम | None | Under construction | Elevated | |
7 | Old High Court | જૂની હાઇ કોર્ટ | ओल्ड हाई कोर्ट | East-West Corridor | Under construction | Elevated | |
8 | Usmanpura | ઉસ્માનપુરા | उस्मानपुरा | None | Under construction | Elevated | |
9 | Vijay Nagar | વિજય નગર | विजय नगर | None | Under construction | Elevated | |
10 | Vadaj | વાડજ | वाडज | None | Under construction | Elevated | |
11 | Ranip | રાણીપ | राणीप | None | Under construction | Elevated | |
12 | Sabarmati Railway Station | સાબરમતી રેલવે સ્ટેશન | साबरमती रेल्वे स्टेशन | None | Under construction | Elevated | |
13 | AEC | એ ઇ સી | ए ई सी | None | Under construction | Elevated | |
14 | Sabarmati | સાબરમતી | साबरमती | None | Under construction | Elevated | |
15 | Motera Stadium | મોટેરા સ્ટેડિયમ | मोटेरा स्टेडियम | None | Under construction | Elevated | |
References
- "Project Profile". GMRC. Retrieved 8 March 2019.