Main Street station (Toronto)

Main Street is a station on Line 2 Bloor–Danforth in Toronto, Ontario, Canada and is located on the east side of Main Street a short distance north of Danforth Avenue. Connections to GO Transit's commuter train service on the Lakeshore East line can be made at Danforth GO Station, approximately 300 metres to the south on the east side of Main Street. Wi-Fi service is available at this station.[2]

Main Street
Location315 Main Street
Toronto, Ontario
Canada
Coordinates43°41′20.5″N 79°18′06″W
PlatformsSide platforms
Tracks2
Connections

 506   306   Carlton
Danforth GO

Construction
Structure typeUnderground
Disabled accessYes
History
OpenedMay 10, 1968
Traffic
Passengers (2018[1])23,950
Rank37 of 75
Services
Preceding station   TTC   Following station
toward Kipling
Bloor–Danforth
toward Kennedy

This station became wheelchair accessible in 2004.[3] An elevator provides access from the streetcar and bus platforms at street level, where the main entrance and collector's booth are located, to an intermediate mezzanine area and directly to the platform for eastbound trains. A second elevator provides a connection between the mezzanine and the westbound subway platform.[4] To facilitate accessibility automatic sliding doors were added at the street entrance and on the north side of the station building, along with an accessible faregate and improved signage.[5] A space is reserved for Wheel-Trans vehicles.

History

Eastbound subway platform

Main Street station was opened in 1968. The station was built on the site of the former Main Loop, which was the eastern terminus of the Carlton streetcar line. The loop closed in 1966 for construction of the subway station.

Unlike most TTC stations, its name includes the word "Street" in order to avoid the possible misreading that it is the subway's "main" station. It is named after Main Street, which was the main street of the suburban town of East Toronto, which was amalgamated into Toronto in 1908.

The station was built with its turnstiles and collector booths on the mezzanine level between the bus and streetcar terminal and the subway platforms. This may have been because until 1973 it was near a fare zone boundary and there was an intention to bring buses from both fare zones into the terminal, as was done at Jane station; however, this 1968 map shows the boundary to one side of the station. The booths and turnstiles were later moved to just inside the street entrance, bringing the buses and streetcars inside the station's fare-paid area.

Main–Danforth has been identified by Metrolinx as a transportation mobility hub as it is located at the interchange of two or more current or planned regional rapid transit lines.[6] As a result, Main Street was the first subway station to be outfitted with new accessible paddle-style fare gates, which replaced the existing tripod turnstiles. The new gates can be opened with Presto cards.[7]

Subway infrastructure in the vicinity

East of the station the tracks angle north away from Danforth Avenue and emerge to run on the surface at the Tyra Portal in Dentonia Park, just west of Victoria Park station. To the west the subway tunnel was mostly constructed by cut-and-cover along Harris Avenue from Woodbine station.

Surface connections

TTC routes serving the station include:

Route Name Additional Information
20 Cliffside Eastbound to Kennedy station
23 Dawes Northbound to St. Clair Avenue East
62 Mortimer Westbound to Broadview station
64 Main Southbound to Queen Street East
87A Cosburn Westbound to Broadview station via East York Acres
87C Westbound to Broadview station
113 Danforth Westbound to Kennedy station
135 Gerrard Eastbound to Warden station
306 Carlton Blue Night Streetcar service to Dundas West station
506 Carlton Streetcar; Westbound to High Park Loop

Trivia

Since 1976, the loop used by the Carlton streetcars has been the northernmost point in Toronto's streetcar system – slightly further north than St. Clair Station on the Yonge Line, the next most northerly point in the streetcar system. This geographical distinction is because Toronto's observed compass directions are skewed from the global compass; although the 512 St. Clair line appears to be further north in Toronto's street grid, when the global compass is used, Main Street station prevails.

Prior to 1976, streetcar service continued east and north from St. Clair station to Mount Pleasant and Eglinton; when this was discontinued, Main Street station became the northernmost point. Mount Pleasant and Eglinton had held the honour since 1954, when the Yonge streetcar was discontinued.

The original reason why the Main loop was built was to relieve congestion on the Luttrell Loop, which was the former terminus of the 506 Carlton.

References

  1. "Subway ridership, 2018" (PDF). Toronto Transit Commission. Retrieved February 5, 2019. This table shows the typical number of customer-trips made on each subway on an average weekday and the typical number of customers travelling to and from each station platform on an average weekday.
  2. "There's now free WiFi at over 40 TTC subway stations". blogTO. Archived from the original on September 12, 2017. Retrieved December 21, 2016.
  3. "Main Street Subway Station Becomes Accessible". Canadian Newswire. November 22, 2004. Retrieved August 1, 2012.
  4. "Installation of elevators at Main Street Station" (PDF). Construction News. Toronto Transit Commission. Retrieved August 1, 2012.
  5. Main Street: Accessible Alternative
  6. "Main-Danforth Mobility Hub Profile" (PDF). Metrolinx. September 19, 2012. Retrieved May 1, 2013.
  7. Novakovic, Stefan (April 8, 2016). "Three Levels of Government Unveil Presto Gates at Main Street". Urban Toronto. Retrieved April 11, 2016.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.