List of major power stations in Sichuan

This page lists the major power stations located in Sichuan Province.

Non-renewable

Coal-based

StationName in ChineseCoordinatesCapacity (MW)StatusOperational units and (type)Under construction unitsPlanned unitsReference
Guang'an Power Station广安电厂30°31′40″N 106°49′34″E2,400Operational4*300MW , 2*600MW,[1][2]
Tianming Power Station 天明电厂 31°52′12″N 104°54′35″E 2,000 Under Construction 2*1,000MW [3]
Jiangyou Power Station江油电厂31°48′17″N 104°46′10″E1,260Operational2*300MW , 2*330MW[4]
Luzhou Power Station泸州电厂28°46′31″N 105°17′01″E1,200Operational2*600MW2*600MW[5]
Jintang Power Station金堂电厂30°42′20″N 104°34′47″E1,200Operational2*600MW4*600MW[6]
Fuxi Power Station 福溪电厂 28°39′49″N 104°41′01″E 1,200 Operational 2*600MW 2*600MW [7]
Gongxian Power Station 珙县电厂 28°16′08″N 104°40′26″E 1,200 Operational 2*600MW 4*1000MW [8]
Baima Power Station白马电厂29°31′37″N 105°00′22″E900Operational3*200MW , 1*300MW2*600MW
Huayinshan Power Station华蓥山发电厂30°53′31″N 107°03′03″E600Operational2*300MW[9][10]

Gas-based

StationName in ChineseCoordinatesCapacity (MW)StatusOperational units and (type)Under construction unitsPlanned unitsReference
Dazhou Natural Gas Power Station达州燃气电厂31°06′54″N 107°29′05″E700Operational2*350MW

Renewable

Hydroelectric

The installed conventional hydropower capacity in Sichuan province has broken through 31,000MW in present,[11] By 2020, The hydropower installed capacity in Sichuan province will increase to over 90,000 MW, accounting for a quarter share of whole Chinese hydropower installed capacity.

Conventional

StationName in ChineseCoordinatesRiverTotal capacity (MW)Dam height (meters)StatusUnitsReference
Xiangjiaba Hydro Power Station向家坝水电站28°38′41″N 104°23′32″EYangtse (Jinsha)7,750161Operational8*800MW, 3*450MW
Xiluodu Hydro Power Station溪洛渡水电站28°15′06″N 103°39′34″EYangtse (Jinsha)13,860278Operational18*770MW
Baihetan Hydro Power Station白鹤滩水电站27°13′22″N 102°54′10″EYangtse (Jinsha)16,000289Under construction16*1,000MW
Wudongde Hydro Power Station乌东德水电站26°20′02″N 102°37′48″EYangtse (Jinsha)10,200270Under construction12*850MW
Yinjiang Hydro Power Station银江水电站 26°35′17″N 101°45′59″EYangtse (Jinsha)390Under construction
Jinsha Hydro Power Station金沙水电站26°34′24″N 101°38′34″EYangtse (Jinsha)560Under construction
Guanyinyan Hydro Power Station观音岩水电站26°31′13″N 101°26′15″EYangtse (Jinsha)3,000159Operational5*600MW
Tuoding Hydro Power Station拖顶水电站Jinsha2060In prep
Rimian Hydro Power Station日冕水电站Jinsha2700In prep
Baiqiu Hydro Power Station白丘水电站Jinsha1500Proposed
Enan Hydro Power Station俄南水电站Jinsha900Proposed
Xulong Hydro Power Station旭龙水电站Jinsha1000Proposed
Changbo Hydro Power Station昌波水电站Jinsha106058Proposed
Suwalong Hydro Power Station苏洼龙水电站Jinsha1340112 Under Construction
Batang Hydro Power Station巴塘水电站Jinsha75069 Under Construction[12]
Lawa Hydro Power Station拉哇水电站30°05′14″N 099°02′26″EJinsha1680234 In prep
Yebatan Hydro Power Station叶巴滩水电站Jinsha2080230Under Construction
Boluo Hydro Power Station波罗水电站Jinsha960Proposed
Yanbi Hydro Power Station岩比水电站Jinsha300Proposed
Gangtuo Hydro Power Station岗托水电站Jinsha1100Proposed
Tongzilin Hydro Power Station桐子林水电站26°42′25″N 101°51′01″EYalong60071.3Operational4*150MW
Ertan Hydro Power Station二滩水电站26°49′15″N 101°46′52″EYalong3,300240Operational6*550MW[13]
Guandi Hydro Power Station官地水电站27°44′39″N 101°55′47″EYalong2,400168Operational4*600MW
Jinping II Hydro Power Station锦屏二级水电站Inlet 28°14′20″N 101°38′32″E, Outlet 28°08′16″N 101°47′32″EYalong4,80034Operational8*600MW
Jinping I Hydro Power Station锦屏一级水电站28°10′53″N 101°37′45″EYalong3,600305Operational6*600MW
Kala Hydro Power Station卡拉水电站28°24′05″N 101°16′37″EYalong1,080128In prep
Yangfanggou Hydro Power Station杨房沟水电站28°38′39″N 101°12′12″EYalong1,500158Under construction
Mengdigou Hydro Power Station孟底沟水电站28°56′54″N 101°10′47″EYalong1,840240In prep
Lenggu Hydro Power Station楞古水电站29°24′58″N 101°08′29″EYalong2,718174In prep
Yageng I Hydro Power Station牙根一级水电站30°05′25″N 101°00′17″EYalong214Proposed
Yageng II Hydro Power Station牙根二级水电站29°40′04″N 101°05′02″EYalong990In prep
Lianghekou Hydro Power Station两河口水电站30°11′11″N 101°00′43″EYalong3,000293Under Construction6*500MW
Gongbagou Hydro Power Station龚坝沟水电站Yalong500Proposed
Gongke Hydro Power Station共科水电站Yalong400Proposed
Xinlong Hydro Power Station新龙水电站Yalong500Proposed
Yingda Hydro Power Station英达水电站Yalong500Proposed
Tongha Hydro Power Station通哈水电站Yalong200Proposed
Geni Hydro Power Station格尼水电站Yalong200Proposed
Ada Hydro Power Station阿达水电站Yalong250Proposed
Reba Hydro Power Station热巴水电站Yalong250Proposed
Renqingling Hydro Power Station仁青岭水电站Yalong300Proposed
Angu Hydro Power Station安谷水电站29°30′51″N 103°38′19″EDadu77240.7Operational4*190MW, 1*12[14]
Shawan Hydro Power Station沙湾水电站29°20′05″N 103°36′38″EDadu480Operational4*120MW[15]
Tongjiezi Hydro Power Station铜街子水电站29°15′24″N 103°37′58″EDadu60082Operational4*150MW[16]
Gongzui Hydro Power Station龚嘴水电站29°18′12″N 103°28′45″EDadu77085.5Operational7*110MW
Shaping II Hydro Power Station沙坪二级水电站29°14′12″N 103°12′28″EDadu34863Under construction6*58MW
Shaping I Hydro Power Station沙坪一级水电站29°17′34″N 103°07′59″EDadu330Proposed6*55MW
Zhengtouba II Hydro Power Station枕头坝二级水电站Inlet 29°16′46″N 103°01′46″E, Outlet 29°15′59″N 103°04′53″EDadu246Operational
Zhengtouba I Hydro Power Station枕头坝一级水电站29°14′19″N 103°02′41″EDadu720Under construction4*180MW
Shenxigou Hydro Power Station深溪沟水电站29°18′06″N 102°55′58″EDadu66049.5Operational4×165MW
Pubugou Hydro Power Station瀑布沟水电站29°12′34″N 102°50′11″EDadu3,600186Operational6*600MW
Laoyingyan Hydro Power Station老鹰岩水电站Dadu640In prep
Longtoushi Hydro Power Station龙头石水电站29°20′08″N 102°13′02″EDadu70072.5Operational4*175MW
Dagangshan大岗山水电站29°26′57″N 102°15′10″EDadu2600210Operational4*650MW
Yingliangbao Hydro Power Station硬梁包水电站Inlet 29°44′18″N 102°12′13″E, Outlet 29°38′06″N 102°10′33″EDadu1,200(run-of-the-river, 15.1 km tunnel)In prep
Luding Hydro Power Station泸定水电站29°56′47″N 102°13′37″EDadu92085.5Operational4*230MW
Huangjinping Hydro Power Station黄金坪水电站30°09′19″N 102°10′41″EDadu85095.5Under construction4*200MW
Changheba Hydro Power Station长河坝水电站30°15′43″N 102°11′43″EDadu2,600240Under construction4*650MW
Houziyan Hydro Power Station猴子岩水电站30°32′46″N 102°03′29″EDadu1,700223.5Under construction4*425MW
Badi Hydro Power Station巴底水电站Dadu680112Proposed
Jinchuan Hydro Power Station金川水电站31°35′09″N 102°04′39″EDadu860111.5In prep4*215MW
Shuangjiankou Hydro Power Station双江口水电站31°47′53″N 101°54′50″EDadu2,000314Under construction4*500MW
Busigou Hydro Power Station卜寺沟水电站Dadu360130Proposed
Dawei Hydro Power Station达维水电站Dadu270107Proposed2*135MW
Bala Hydro Power Station巴拉水电站Dadu700220Proposed
Xiaerjia Hydro Power Station下尔呷水电站Dadu540Proposed
Kajiwa Hydro Power Station卡基娃水电站28°42′26″N 100°53′35″EMuli452.4171Under construction4*110MW
Lizhou Hydro Power Station立洲水电站Muli355138Under construction3*115MW, 1*10MW
Shangtongba Hydro Power Station上通坝水电站Muli240Under construction3*80MW
Muli Shawan Hydro Power Station木里河沙湾水电站Muli280Operational
Zipingpu Hydro Power Station紫坪铺水电站31°02′06″N 103°34′27″EMin760156Operational4*190MW
Taipingyi Hydro Power Station太平驿水电站31°13′33″N 103°29′11″EMin260Operational4*65MW
Futang Hydro Power Station福堂水电站31°29′03″N 103°36′12″EMin360Operational4*90MW
Jianwei Hydro Power Station犍为航电枢纽29°14′18″N 103°55′19″EMin500.4Operational9*55.6MW
Longxikou Hydro Power Station龙溪口航电枢纽29°03′39″N 104°08′34″EMin480Under Construction9*53.3MW
Baozhusi Hydro Power Station宝珠寺水电站32°31′12″N 105°36′43″EBailong700132Operational4*175MW
Qiaoqi Hydro Power Station硗碛水电站Baoxinghe240125Operational3*80MW
Yele Hydro Power Station冶勒水电站28°55′08″N 102°13′03″ENanyahe240124.5Operational
Jinwo Hydro Power Station金窝水电站Tianwanhe280124.5Operational2*130MW
Renzonghai Hydro Power Station仁宗海水电站Tianwanhe24056Operational
Xiaotiandu Hydro Power Station小天都水电站Wasigou24039Operational
Tingzikou Hydro Power Station亭子口水电站31°49′24″N 105°52′07″EJialing1,100116Operational4*275MW
Dusong Hydro Power Station独松水电站Big Jinchuan1,360111.5Proposed
Maoergai Hydro Power Station毛尔盖水电站32°03′56″N 103°13′55″EHeishui420147Operational3*140MW
Jianke Hydro Power Station剑科水电站Maoergai24683Under construction3*82MW
Jiangbian Hydro Power Station江边水电站28°36′18″N 101°41′58″EJiulong330Under construction3*110MW
Xigu Hydro Power Station溪古水电站Jiulong249Under construction3*83MW
Guanzhou Hydro Power Station关州水电站Xiaojinchuan240Under construction3*80MW
Jiniu Hydro Power Station吉牛水电站Geshizha240Under construction2*120MW
Chuosijia Hydro Power Station绰斯甲水电站Chuosijia390Under construction
Quxue Hydro Power Station去学水电站Shuoqu246164.2Under construction2*123MW

*Jingping II Hydro Power Station is a Run-of-the-river type of power station. There are 4 water tunnels which are 16.6 km long in average each to divert the water through the Jingping mountains. The deepest point of the tunnel is 2,525 meters from the top of mountain.

Pumped-storage

StationName in ChineseCoordinatesCapacity (MW)StatusGenerator unitsHeight difference (meters)Under construction unitsPlanned unitsReference
Lijiashan Pumped-storage Hydro Power Station李家山抽水蓄能电站Proposed[17]

Wind

StationName in ChineseCoordinatesOperational capacity (MW)StatusUnits
Decang德昌风电场16Underconstruction8*2MW

References

  1. "Archived copy". Archived from the original on 2010-04-05. Retrieved 2010-09-29.CS1 maint: archived copy as title (link)
  2. http://gb.cri.cn/14714/2007/07/05/2785@1664236.htm
  3. "神华四川天明电厂2×100万千瓦新建工程#2机组 电除尘顺利开工 - 北极星电力新闻网". news.bjx.com.cn. Retrieved 2017-09-10.
  4. "Archived copy". Archived from the original on 2011-07-07. Retrieved 2010-09-29.CS1 maint: archived copy as title (link)
  5. "Archived copy". Archived from the original on 2013-01-26. Retrieved 2010-09-29.CS1 maint: archived copy as title (link)
  6. "Archived copy". Archived from the original on 2010-12-30. Retrieved 2010-09-29.CS1 maint: archived copy as title (link)
  7. http://news.163.com/09/1118/17/5ODVVKM8000120GR.html
  8. http://www.ocn.com.cn/qyqb/2006hlfd03.htm
  9. "Archived copy". Archived from the original on 2011-07-14. Retrieved 2010-10-08.CS1 maint: archived copy as title (link)
  10. "Archived copy". Archived from the original on 2011-07-07. Retrieved 2010-10-08.CS1 maint: archived copy as title (link)
  11. http://news.china.com.cn/rollnews/2010-09/10/content_4239307.htm
  12. "总投资102亿元!甘孜州巴塘水电站开工建设,预计2022年投产!_工作". www.sohu.com. Retrieved 2019-07-07.
  13. "Archived copy". Archived from the original on 2011-07-07. Retrieved 2010-09-29.CS1 maint: archived copy as title (link)
  14. "Archived copy". Archived from the original on 2014-02-19. Retrieved 2012-04-01.CS1 maint: archived copy as title (link)
  15. http://blog.sina.com.cn/s/blog_5e3fe91f0100dctv.html
  16. http://baike.baidu.com/view/667888.htm
  17. http://www.huaxiawind.com.cn/detail_hyp.asp?infoId=13486
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.