Jewellery Quarter station

Jewellery Quarter station is a combined railway station and tram stop, situated in the Jewellery Quarter of Birmingham, England. The station is served by West Midlands Trains (who operate the station), Chiltern Railways, and Midland Metro.

Jewellery Quarter
Train and tram at Jewellery Quarter station in 2005.
Location
PlaceJewellery Quarter
Local authorityBirmingham
Coordinates52.4897°N 1.9136°W / 52.4897; -1.9136
Grid referenceSP059879
Operations
Station codeJEQ
Managed byWest Midlands Trains
Number of platforms2
DfT categoryE
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2014/15 0.392 million
2015/16 0.427 million
2016/17 0.421 million
2017/18 0.426 million
2018/19 0.514 million
Passenger Transport Executive
PTETransport for West Midlands
Zone1
History
1995Opened
National Rail – UK railway stations
  • Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Jewellery Quarter from Office of Rail and Road statistics. Methodology may vary year on year.
Jewellery Quarter
Midland Metro tram stop
Midland Metro platforms, looking towards Birmingham.
LocationJewellery Quarter
Birmingham
England
Line(s)Line 1 (Birmingham – Wolverhampton)
Platforms2
History
Opened31 May 1999
Traffic
Passengers (2015/16)Approx. 900 daily[1]

The station is set at the mouth of Hockley No 2 Tunnel below the elevation of its road-level access point on Vyse Street; stairs and a lift are provided.

History

Jewellery Quarter station was opened in 1995, as part of the "Jewellery Line" project which saw the re-introduction of cross-city services via Birmingham Snow Hill. Midland Metro services commenced in 1999, when its first (and so far only) line from Birmingham to Wolverhampton opened.[2]

No previous station had existed at this site, however the area was historically served by Hockley station, located a short distance west, which had been opened by the Great Western Railway in 1854, and was closed with the line in 1972.[2]

Facilities

The station has no car park, but ten cycle storage spaces are available.[3] The station has a ticket office, but this has limited opening hours; a self-service ticket machine is provided for use when the ticket hall is closed and for collecting pre-paid tickets. Train running information is offered via automated announcements, CIS displays, timetable posters and customer help points on each side.

Services

Train

Most trains are operated by West Midlands Trains. The Monday to Saturday daytime service sees trains approximately every 10 minutes in each direction, operating between Stourbridge Junction, Birmingham Snow Hill, and either Dorridge or Whitlocks End. Many trains continue beyond Stourbridge to Kidderminster, Worcester Foregate Street or Great Malvern, and some continue beyond Whitlocks End & Dorridge to Stratford-upon-Avon.[4]

Chiltern Railways services operate in peak hours only, between Kidderminster and London Marylebone. Unlike WMT services, only a few Chiltern trains call at Jewellery Quarter.

Metro

West Midlands Metro services operate at frequent intervals, between Grand Central and Wolverhampton St George's. Mondays to Fridays, Midland Metro services in each direction run at six to eight-minute intervals during the day, and at fifteen-minute intervals during the evenings and on Sundays. They run at eight minute intervals on Saturdays.[5]

Preceding station   Midland Metro   Following station
Soho, Benson Road   Line 1   St Paul's
National Rail
The Hawthorns   West Midlands Railway
Snow Hill-Worcester
  Birmingham Snow Hill
The Hawthorns   Chiltern Railways
London-Kidderminster
  Birmingham Snow Hill

See also

References

  1. "2016 West Midlands Travel Trends Covering Report" (PDF). West Midlands Combined Authority. p. 39. Archived from the original (PDF) on 2 February 2017. Retrieved 23 January 2017.
  2. "Jewellery Quarter Station 1995 - Present". Rail Around Birmingham & the West Midlands. Retrieved 21 January 2017.
  3. Jewellery Quarter station facilities National Rail Enquiries
  4. Table 71 National Rail timetable, May 2016
  5. "Midland Metro timetable". Network West Midlands. Retrieved 11 July 2019.

Further reading

  • Mitchell, Vic; Smith, Keith (2007). Worcester to Birmingham. Middleton Press. figs. 110-111. ISBN 9781904474975. OCLC 263292710.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.