Daejeon Metro

Daejeon Metro (Korean: 대전도시철도; Hanja: 大田都市鐵道; RR: Daejeon dosicheoldo) is the rapid transit system of Daejeon, South Korea, operated by the Daejeon Metropolitan Express Transit Corporation (DjeT, or Daejeon Metro). The single-line subway network first opened in 2006 with 12 stations. The line was expanded in 2007 and it now consists of one line, 22 operating stations, and 22.6 kilometres (14.0 mi) of route.

Daejeon Metro
Overview
LocaleDaejeon, South Korea
Transit typeRapid transit
Number of lines1
Number of stations22
Daily ridership110,307 (2019) [1]
Annual ridership40,262,211 (2019)[1]
Websitehttp://www.djet.co.kr/
Operation
Began operation16 March 2006 (2006-03-16)
Operator(s)Daejeon Metropolitan Express Transit Corporation
Number of vehiclesHyundai Rotem Metro cars
Technical
System length22.74 km (14.13 mi)
Track gauge1,435 mm (4 ft 8 12 in)
System map

Daejeon Metro
Hangul
Hanja
Revised RomanizationDaejeon dosicheoldo
McCune–ReischauerTaejŏn tosich'ŏlto
Daejeon Metro
판암
101
신흥
102
to Busan (Gimcheon-Gumi)
via Gyeongbu Line/HSR
대동
103
↑↓
Planned
Line 2
대전
104
중앙로
105
Proposed
Line 3
중구청
106
to Seoul (Osong)
via Gyeongbu Line/HSR
서대전네거리
107
↑↓
Planned
Line 2
서대전역
      
Seodaejeon
오룡
108
Proposed
Line 5
to Mokpo (Gyeryong)
via Honam Line/HSR
용문
109
Proposed
Line 4
탄방
110
시청
111
정부청사
112
갈마
113
월평
114
갑천
115
유성온천
116
↑↓
Planned
Line 2
구암
117
현충원
118
월드컵경기장
119
노은
120
지족
121
반석
122

Legend
Numbers
Station number
  
Completed line/station
  
Planned and proposed
  
Connecting passenger rail (KORAIL/KTX)

History

After the city's administrative district was expanded in 1995, plans were announced in February 1996 for a five-line metro service totaling 102.3 kilometres (63.6 mi). Construction of Line 1 began in October 1996 and was scheduled to be completed by 2003, but completion was delayed by right-of-way acquisition and constrained finances in the wake of the Asian financial crisis.[2]

Lines

Line Name
English
Line Name
Hangul
Starting Station(s) Ending Station(s) Stations Total Length
in km
 1  1호선 Panam Banseok 22 22.7

Line 1

Line 1 was initially designed to be 22.6 kilometres (14.0 mi) long, connecting the old and new town centers.[2] It opened in two phases and a third is planned:

  • 16 March 2006: Line 1 Phase 1 opened (Panam ↔ Government Complex)
  • 17 April 2007: Line 1 Phase 2 complete, fully opened (Panam ↔ Banseok)
  • 2029: Tentative opening date of extension from Banseok to Government Complex Sejong[3]

The track leads from Banseok Station in Yuseong-gu to Panam Station in Dong-gu.

Line 2

The construction of a Line 2 was planned to begin in 2008, but is delayed because government funding has been diverted to other projects.[4]

"Line 2" will have construction begin "soon" according to statements from the Daejeon Metropolitan Government. The new "Line 2" will be a mix of ground level and elevated track. Experts hope to have test portions of the line operational by 2018, but estimates show the full line will probably not be finished until after 2021.[5]

There have been plans to build line 2 as a magnetic levitation train similar to the German M-Bahn or the Japanese HSST.[4][6] The current technical design, however, is not open to the public.[4]

See also

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.