Central Bi-Oceanic railway

The Central Bioceanic Railway Corridor (Portuguese: Corredor Ferroviario Bioceánico Central) (CFBC), is a rail project in the countries of Brazil and Peru.[1][2] The project would join the port of Santos, Brazil on the coast of the Atlantic Ocean with the port of Callao, Peru, on the coast of the Pacific Ocean.[3] The cost of the project is estimated to $US 20 billion.[4]

Project

In his trip to China in 2013, Bolivian president Evo Morales discussed with Xi Jinping, General Secretary of the Communist Party of China, the possibility of building a railway to link the Atlantic with the Pacific through Brazil and Peru. The Chinese president requested a study of feasibility by 2014.[5]

The Spanish narrow gauge rail company, FEVE, was awarded a contract by the Bolivian government to prepare a technical feasibility study.[6] The first studies were prepared by Spanish, French and Bolivian consultants and were to be delivered by June 2014.[7]

In August 2014, a mission from Bolivia sought financing from the Chinese government.[8][9]

The summit of the Union of South American Nations (Unasur) in December 2014, prioritised the project along with seven other regional integration projects.[10]

The project contemplates four baseline studies: the basic engineering design, the market study, the strategic study and the environmental study.[11] The four studies would be complete by 31 December 2014.[12]

The Bolivian minister of Public Works, Services and House, Vladimir Sánchez, stated the first phase is to build the railroad; the second phase is to electrify the railroad, and a third phase is to have a double-track railroad.

The project looks for 95% of the trade of the south and North of the Peru, as well as the integration to Brazil.[13]

Route

See also

References

  1. "Evo ve 'jugada sucia' de Perú en el proyecto del tren bioceánico". La Razón. 20 October 2012. Retrieved 27 October 2014.
  2. "Evo choca con Perú por ruta de Corredor Bioceánico". La Tercera. 21 October 2014. Retrieved 27 October 2014.
  3. "El ferrocarril que unirá a Perú y Bolivia". La República. 10 December 2013. Archived from the original on 5 November 2014. Retrieved 27 October 2014.
  4. "Presidente de Bolivia cuestiona al Perú por ruta de tren bioceánico". Gestión. 22 October 2012. Retrieved 27 October 2014.
  5. "China pide estudio de construcción de tren interoceánico". La Paz: La Razón. 29 December 2013.
  6. "Se iniciaron estudios para un corredor ferroviario bioceánico". El Día. 2 June 2014. Retrieved 27 October 2014.
  7. "Corredor ferroviario que uniría a Brasil, Perú y Bolivia tendría un costo de US$10.000M". americaeconomia.com. 26 May 2012. Retrieved 27 October 2014.
  8. "Gobierno boliviano gestiona corredor bioceánico que conectará Perú y Brasil". americaeconomia.com. 27 July 2012. Retrieved 27 October 2014.
  9. "Bolivia pedirá ayuda a China para sacar adelante ruta ferroviaria bioceánica". lostiempos.com. 6 August 2014. Archived from the original on 2014-10-27. Retrieved 27 October 2014.
  10. "Unasur priorizará el corredor bioceánico que incluye a Bolivia". La Razón. 8 December 2014. Retrieved 14 December 2014.
  11. "Megaproyecto ferroviario apunta a exportar 95% de carga por Perú". La Razón. 25 May 2012. Retrieved 27 October 2014.
  12. "Bolivia concluirá hasta fin de año estudios para construir tren bioceánico Atlántico-Pacífico". La Razón. 25 November 2014. Retrieved 25 November 2014.
  13. "Bolivia se entromete y busca gestionarse en China para que tenga una participación en el proyecto de tren interoceánico Brasil-Perú". La Razón. 22 October 2012. Retrieved 27 October 2014.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.