Wenchong station
| |||||||||||
Chinese name | |||||||||||
Simplified Chinese | 文冲站 | ||||||||||
Traditional Chinese | 文沖站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location |
East of Dashadi Road (大沙地东路) and Shihua Road (石化路) Huangpu District, Guangzhou, Guangdong China | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 5 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
History | |||||||||||
Opened | 28 December 2009 | ||||||||||
Services | |||||||||||
|
Wenchong Station (Chinese: 文冲站), formerly Wenyuan Station (文圆站),[1] is a terminus of Line 5 of the Guangzhou Metro.[2] It is located under the junction of Dashadi Donglu (大沙地东路) and Shihua Lu (石化路), in the Huangpu District.[3][4] It opened in December 2009.[5] In the future, Line 5 is planned to be extended from Wenchong Station to the Huangpu Coach Terminal Station.[6]
Station layout
G | - | Exits |
L1 Concourse |
Lobby | Customer Service, Shops, Vending machines, ATMs |
L2 Platforms |
Platform 2 | |
Island platform, doors will open on the left | ||
Platform 1 | 5 termination platform |
Exits
Exit number | Exit location | |
---|---|---|
Exit A | Dashadi Donglu | |
Exit B | Dashadi Donglu | |
Exit D | Shihua Lu |
References
- ↑ 广州地铁五号线概况 (in Chinese).
- ↑ Metro Line 5 Opens This December
- ↑ 廣州地鐵五號線投標申請人報名提交資料一覽表 (in Chinese).
- ↑ 地铁五号线文冲站出现“钉子户” (in Chinese).
- ↑ Guangzhou Metro line Five to Open in December 2009
- ↑ 地铁五号延长线直至黄埔客运站 (in Chinese).
Coordinates: 23°06′14″N 113°28′08″E / 23.1038°N 113.4689°E
This article is issued from
Wikipedia.
The text is licensed under Creative Commons - Attribution - Sharealike.
Additional terms may apply for the media files.