Warsaw–Grodzisk Mazowiecki railway

Warsaw–Grodzisk Mazowiecki railway
Overview
Type Heavy rail
Status in use
Locale Poland
Termini Warsaw
Grodzisk Mazowiecki
Operation
Opened 1927 (1927)
Technical
Line length 32 km (20 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 3000 V DC
Operating speed 120 km/h (75 mph)
Route number 47 (Warszawa Śródmieście WKD – Grodzisk Mazowiecki Radońska), 48 (Podkowa Leśna Główna – Milanówek Grudów), 512 (Pruszków – Komorów)
Route map
to Warszawa Wschodnia
Warsaw Metro Centrum Warsaw Metro
Warszawa Śródmieście
Warszawa Centralna
0.00 Warszawa Śródmieście WKD
1.71 Warszawa Ochota Polish State Railways
to Warszawa Gdańska
2.61 Warszawa Zachodnia Polish State Railways
Warszawa Wola
4.06 Warszawa Reduta Ordona
5.54 Warszawa Aleje Jerozolimskie
Polish State Railways PKP line to Radom
6.97 Warszawa Raków
8.13 Warszawa Salomea
9.64 Opacz
11.38 Michałowice
12.96 Reguły
14.24 Malichy
15.48 Tworki
16.56 Pruszków WKD
technical line to Pruszków PKP
18.13
3.05
Komorów
19.60 Nowa Wieś Warszawska
21.36 Kanie Helenowskie
22.43 Otrębusy
24.04 Podkowa Leśna Wschodnia
24.96 Podkowa Leśna Główna
25.86
0.48
Podkowa Leśna Zachodnia
 
1.53
Polesie
 
2.68
Milanówek Grudów
27.39 Kazimierówka
28.89 Brzózki
30.23 Grodzisk Mazowiecki Okrężna
30.87 Grodzisk Mazowiecki Piaskowa
31.94 Grodzisk Mazowiecki Jordanowice
32.61 Grodzisk Mazowiecki Radońska

The Warsaw–Kunowice railway is a Polish 32-kilometre long suburban railway line, that connects Warsaw with Grodzisk Mazowiecki.

Opening

The line was opened in 1927.


Modernisation

The line was planned to be re-electrified from 600 V DC to 3 kV DC 2013.[1] This eventually happened on the night of 27/28 May 2016.

In November 2015 PKP PLK announced a tender for the modernisation of Route 447 on the section between Warszawa Włochy and Grodzisk Mazowiecki. As part of modernisation, which is to improve movements in the Warsaw agglomeration, the stations on the line will be rebuilt and a new station will be built in Parzniew. After completion of the work the line speed will increase from 60–80 km/h to 120 km/h. The investment is planned for the years 2016-2019.[2]

Usage

The line is used by the company Warszawska Kolej Dojazdowa who operate services between Warszawa Śródmieście WKD and Grodzisk Mazowiecki Radońska. There is a branch to Milanówek Grudów from Podkowa Leśnia Główna.

See also

References

Media related to Warsaw–Grodzisk Mazowiecki railway at Wikimedia Commons


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.