Seyrantepe Dam

Seyrantepe Dam
Aerial photo of the dam and its power station
Location of Seyrantepe Dam in Turkey
Country Turkey
Location Karakoçan on the border of Elazığ and Tunceli Province
Coordinates 39°1′15.68″N 39°53′29.87″E / 39.0210222°N 39.8916306°E / 39.0210222; 39.8916306Coordinates: 39°1′15.68″N 39°53′29.87″E / 39.0210222°N 39.8916306°E / 39.0210222; 39.8916306
Purpose Power, regulation
Status Operational
Construction began 2003
Opening date 2008 (2008)
Dam and spillways
Type of dam Embankment, sand and gravel-fill
Impounds Peri River
Height (foundation) 48.5 m (159 ft)
Height (thalweg) 36 m (118 ft)
Operator(s) Limak Energy and Bilgin Energy
Commission date September 2008
Type Conventional
Hydraulic head 36 m (118 ft) (gross)
Turbines 2 x 29.39 MW Francis-type
Installed capacity 58.78 MW
Annual generation 180 GWh

The Seyrantepe Dam is an earth-fill embankment dam on the Peri River (a tributary of the Euphrates), located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW.[1] It is owned and operated by Limak Energy and Bilgin Energy.[2] The sand and gravel-fill dam is 48.5 m (159 ft) tall.[3]

At the opening of the hydro plant, President (then-Prime Minister) Recep Tayyip Erdoğan used the opportunity to attack environmentalist critics, a campaign he sustained in office: he said

"While making these investments we are also taking the natural life into consideration. We know that most of the [environmentalist] criticisms in the media in this regard are ideological. On the other hand, we are already taking reasonable and sincere criticisms into account and we are examining them. Just like in the case where we consider the balance between democracy and security, we are continuing our balanced approach between development and environment. No one shall have any doubts on this. But we should not forget; while preaching environment, we should not forget to say that humans come first. Because humans come before anything else. The living conditions of our people are very crucial for us."

Speech during the opening ceremony of the Seyrantepe Hydroelectricity Plant, Peri Suyu [4]


See also

References

  1. "Seyrantepe Dam and Hydroelectric Power Plant" (in Turkish). Bilgin Energy Investment Holding Co. Retrieved 23 June 2015.
  2. "Seyrantepe Dam and HEPP". Enerji Atlasi. Retrieved 23 June 2015.
  3. "List of facilities dam and hydropower" (PDF) (in Turkish). Suyapi. Archived from the original (PDF) on 10 February 2014. Retrieved 23 June 2015.
  4. Milliyet. 2008. Erdoğan: Çevre eleştirileri ideolojik.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.