Salal Hydroelectric Power Station

Salal Dam
View of Salal Dam from Jyotipuram-Salal road
Location of Salal Dam in Jammu and Kashmir, India
Official name Salal Hydroelectric Power Station
Country India
Location Jammu and Kashmir
Coordinates 33°08′33″N 74°48′37″E / 33.14250°N 74.81028°E / 33.14250; 74.81028Coordinates: 33°08′33″N 74°48′37″E / 33.14250°N 74.81028°E / 33.14250; 74.81028
Status Operational
Construction began 1970
Opening date 1987
Construction cost ₹ 928.89 crores
Dam and spillways
Type of dam Gravity dam
Impounds Chenab River
Height 113 m
Length 450 m
Dam volume 1.45 million m³
Spillways 12
Spillway capacity 22,500 m³/s
Reservoir
Creates Salal Lake
Active capacity 14.78 million m³
Surface area 3.74 km²
Power Station
Operator(s) NHPC
Commission date Stage I: 1987
Stage II: 1995
Type Conventional
Hydraulic head 94.5 m (310 ft)
Turbines Stage I: 3 x 115 MW Francis-type
Stage II: 3 x 115 MW Francis-type
Installed capacity Stage I: 345 MW
Stage II: 345 MW
Total: 690 MW
Annual generation 3082 million kWh
Website
http://www.nhpcindia.com/

Salal Dam (Hindi: सलाल बाँध Salāl Bāndh), also known as Salal Hydroelectric Power Station, is a run-of-the-river power project on the Chenab River in the Reasi district of the Indian state of Jammu and Kashmir.[1]

History

The project was conceived in 1920. The feasibility studies on the project commenced in 1961 by the state government of Jammu and Kashmir and construction was started in 1970 by Central Hydroelectric Project Control Board under the Ministry of Irrigation and Power.

In 1978 construction of the projects was entrusted to National Hydroelectric Power Corporation on agency basis. After completion of project, it was handed over to NHPC on ownership basis for Operation and Maintenance. Stage-I of the project was commissioned in 1987. First unit of Stage-II of the project was commissioned in 1993, second in 1994 and third in 1995.

At the peak of construction, about 12,000 personnel including contractors worked around the clock to complete the project from 1970s to present day, under proper guidance and maintenance of India's most successful company NHPC (National Hydroelectric Power Corporation). The project was taken by HCC and various contractors.

Dam

Spillway at top of the Concrete Dam, used to remove excess water from dam, at Salal Hydroelectric Power Station
Penstocks, used to move gushing water from dam to turbine, at Salal Power Station
Rockfill Dam, Salal Hydroelectric Power Station
  • Full Reservoir level : 487.68 m
  • Maximum water level : 494.08 m
  • Length of power dam : 105 m
  • Length of non overflow dam : 125 m
  • Type of gate : Radial
  • Top elevation : 495.91 m
  • Deepest foundation level : 383 m
  • No of river sluices : 6 of 3.35 m x 4.57 m

Power Distribution

Power from the project is transmitted to the Northern Grid where it is distributed to the states of Jammu and Kashmir, Punjab, Haryana, Delhi, Himachal Pradesh, Rajasthan, and Uttar Pradesh, and the union territory of Chandigarh.[2]

Tailrace tunnel

  • Number : Two
  • Length Stage I : 2.463 km
  • Stage II : 2.523 km
  • Shape : Horseshoe
  • Diameter : 11 m (finished)
  • Design discharge : 412 m³/s
  • Velocity : 4.2 m/s

[2]

Transmission lines

  • Name of Grid : Northern grid
  • Transmission Voltage : 220 kV
  • Total length of lines : 446 km
  • Double circuit Salal - Kishenpur : 2 lines
  • Single circuit Salal - Jammu : 2 lines

See also

References

  1. "NHPC investment crosses Rs 18,800 crore in J&K". Retrieved 10 January 2018.