Perovo Solar Park
Perovo Solar Park | |
---|---|
| |
Location | Perovo, Crimea |
Coordinates | 44°54′N 33°56′E / 44.900°N 33.933°ECoordinates: 44°54′N 33°56′E / 44.900°N 33.933°E |
Status | Operational |
Solar field | |
Type | Flat-panel PV |
Site area | 200 ha (494 acres) 200 ha (2 km2) |
Power generation | |
Units operational | 440,000 |
Nameplate capacity | 100 MW |
Annual net output | 132.5 GWh[1] |
The Perovo Solar Park is a 100 MWp photovoltaic power station located at Perovo, Simferopol Raion, Crimea. As of July 2012 it is the world's fourth-largest solar farm, and is made up of 440,000 solar panels. It is owned by Activ Solar, and the final 20 MW stage was completed on December 29, 2011.
In 2009, Ukraine established a feed-in tariff of €0.46 per kilowatt hour until 2030, one of the highest.[2]