Parc Cynog

Parc Cynog
Country Wales, United Kingdom
Coordinates 51°45′29″N 4°31′34″W / 51.758°N 4.526°W / 51.758; -4.526Coordinates: 51°45′29″N 4°31′34″W / 51.758°N 4.526°W / 51.758; -4.526
Status Operational
Commission date 2001
Owner(s) Vattenfall
Operator(s) Nuon Renewables
Wind farm
Type Onshore
Power generation
Units operational 11
Nameplate capacity 8.4 MW

Parc Cynog is a wind farm operated by Nuon Renewables in Wales.[1][2]

Parc Cynog Windfarm was built in 2001. The Windfarm currently consists of 11 turbines.

There were originally five turbines on site which are Micon M1800-750/48 turbines built in 2001, by 2009, a further six turbines were installed by Enercon Wind Energy, the technology used was Enercon E48.

The windfarm is owned by Vattenfall.[3]

References

  1. "Parc Cynog Wind Farm". nuonrenewables.com. Archived from the original on 2010-12-07. Retrieved 2017-03-07.
  2. http://www.manta.com/ic/mvmhccd/gb/parc-cynog-wind-farm-ltd
  3. "Parc Cynog". corporate.vattenfall.co.uk. Retrieved 2017-03-07.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.