New Ulaanbaatar International Airport

New Ulaanbaatar International Airport
Улаанбаатар хотын олон улсын шинэ нисэх онгоцны буудал
Project logo
Rendering of the proposed look
Summary
Airport type Public
Owner Government of Mongolia
Operator Civil Aviation Authority of Mongolia
Serves Ulaanbaatar, Mongolia
Elevation AMSL 1,366 m / 4,482 ft
Coordinates 47°39′00″N 106°49′08″E / 47.65000°N 106.81889°E / 47.65000; 106.81889Coordinates: 47°39′00″N 106°49′08″E / 47.65000°N 106.81889°E / 47.65000; 106.81889
Website www.nubia.mn
Map
UBN
Location within Mongolia
Runways
Direction Length Surface
m ft
11/29 3,600 11,811 Concrete

The New Ulaanbaatar International Airport (Mongolian: Улаанбаатар хотын олон улсын шинэ нисэх онгоцны буудал) (IATA: UBN, ICAO: ZMCK), or the Khöshig Valley Airport (Mongolian: Хөшигийн хөндийн нисэх буудал[1]) is a new international airport presently under construction[2] 52 km south of Ulaanbaatar city center in Sergelen sum, Töv Province, Mongolia. It will serve Ulaanbaatar and its metropolitan area.[3][4][5][6][7][8].

Originally hoped to open in 2016[7] but repeatedly postponed [9], the airport is now expected to start receiving air traffic in August 2019.[10] This airport will replace and obtain the name of the current Chinggis Khaan International Airport[9][11].

The New Ulaanbaatar International Airport airport is designed with a capacity of up to three million passengers per year,[12] and has sufficient space for a possible future expansion, making it potentially capable of serving twelve million passengers yearly. It will also be equipped with a 24-hour all-weather air traffic control system.[13] The average annual number of passengers is estimated to be around 2.5 million. In comparison, the current airport (Chinggis Khaan International Airport, the largest airport in Mongolia) serves about 900,000 passengers per year (2011 figures). Cargo capacity is set to increase 10-fold.[14]

There will be 2 runways, a road and rail terminal and a town nearby with a population of about 100 thousand people. The airport is designed with a capacity to carry 1,100 passengers per hour.[3][4]

History

Development

Initial planning for the new airport was done in 2006 with Japanese assistance[9].

In May 2008, a ¥28.8 billion (US$385 million) 40-year soft loan agreement at 0.2% interest was signed between the Government of Mongolia and the Japan Bank for International Cooperation to build a new international airport.[5][6] The loan requires that the project is to be carried out by Japanese Consultants and Contractors however the materials and equipment the Contractors use can be up to 70% from any country. Between 2009 and 2011, Azusa Sekkei and Oriental Consultants Joint Venture made the design and bid documentation for the airport. In 2011, a call for bids was announced for the construction of the airport, with the Mitsubishi-Chiyoda Joint Venture (MCJV) successful in the Technical Bidding. An extended Price review and Contract negotiation was completed on 10 May 2013 when the main construction contract was signed between MCJV and the Civil Aviation Authority of Mongolia .[7][8]

The final amount of loans from the Japanese Government for the development of the airport totaled ¥65.6 billion (US$600 million), to be paid over 40 years[9].

Construction

The project was begun with a ground breaking ceremony. Taking place on 22 April 2012,[15][16] the first work started was a site flood protection scheme. Other works under way were the construction of the electric power line from Nalaikh.

Construction started in May 2013, and was finished in January 2017, the flights will commence in May 2018.[17] The New Ulaanbaatar International Airport Construction Project Steering Committee visited the project construction work site on 11 September 2013 to see the progress of construction work.[18] The concrete pouring work for the control tower started on 13 September 2013.[19]

On 29 January 2013, the airport's electric substation construction was completed and connected to the Mongolian central grid.[20] The end of the main construction activities was on January 2017, with the Japanese side handing over the project to the Civil Aviation Authority of Mongolia[21].

Construction of a 6-lane, 30.4 km-long highway to Ulaanbaatar was started in May 2016[22].

Transportation

The airport is connected to the highway to the capital. Moreover, on June 2016, Aeroexpress, the airport rail link company, made a decision to build the first international route from Ulaanbatar city center to the airport using railbuses, differently compared to the current other Aeroexpress rail routes. The first stage is due to finish in 2017 and full completition is planned in 2030.[23]

Name

The construction project name for the airport is the New Ulaanbaatar International Airport or NUBIA.[24][25] Alternative names given in the media include Chinggis Khaan International Airport, Khöshig Valley International Airport, Khöshig International Airport and Ulaanbaatar Khöshig International Airport.

See also

References

  1. Temporary names
  2. Progress being made in Khushigt Valley international airport construction
  3. 1 2 АВИА Порт
  4. 1 2 Новости
  5. 1 2 "Japan ODA Loan for Mongolia". JICA. Retrieved 2 May 2008.
  6. 1 2 "Mongolia starts to build new int'l airport". China Daily. Retrieved 26 August 2012.
  7. 1 2 3 gogo.mn Archived 2012-12-29 at the Wayback Machine. Хөшигийн нисэх буудлыг "Мицубиши Чиёодо" барина
  8. 1 2 "Khushigt Valley Airport will be operational in 2016". UB Post. Retrieved 23 January 2013.
  9. 1 2 3 4 Б, Бямбасүрэн (2018-08-21). "ТАНИЛЦ: Онцлох бүтээн байгуулалт буюу ШИНЭ НИСЭХ БУУДЛЫН ажлын явц". Ikon.mn. Retrieved 22 August 2017.
  10. "Mongolia delays launch of $500-million airport until 2019". Reuters. 4 January 2018. Retrieved 2018-02-17.
  11. Б, Билгүүн (2017-07-19). "Хөшигийн хөндийн онгоцны буудал 2018 оны наймдугаар сард ашиглалтад орно". Ikon.mn. Retrieved 22 August 2017.
  12. Ulaanbaatar airport
  13. Contract for new international standard airport signed
  14. Ulaanbaatar to Have New International Airport
  15. "Construction Begins on New Airport" (PDF). Mongol Messenger. Retrieved 22 April 2012.
  16. "New Airport Started". Infomongolia.com. Archived from the original on 26 April 2012. Retrieved 22 April 2012.
  17. http://en.montsame.mn/society/9217
  18. The New Ulaanbaatar International Airport Construction Project Government Steering Committee Site Visit
  19. Control Tower First Structural Concrete Pour
  20. Төвийн эрчим хүчний системээс байнгын эрчим хүчтэй холбогдлоо
  21. http://www.nubia.mn/
  22. Б, Манлай. "ФОТО: Хөшигийн хөндийн ХУРДНЫ замыг барьж эхэллээ". 2016-05-06. Ikon.mn. Retrieved 22 August 2017.
  23. http://asiarussia.ru/news/12678/
  24. "Project Web Site". MCAA. Retrieved 24 January 2013.
  25. "facebook site". MCAA.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.