Medak–Akkannapet section
Medak–Akkannapet section | |
---|---|
Overview | |
Status | Under construction |
Locale | Telangana |
Termini |
Medak Akkannapet |
Operation | |
Owner | Indian Railway |
Operator(s) | South Central Railway |
Technical | |
Track length | 17.2 km (10.7 mi) |
Track gauge | 1,676 mm (5 ft 6 in) Broad gauge |
Medak–Akkannapet section | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
The Medak–Akkannapet section is an ongoing railway section project of the Indian Railways. The section falls under the jurisdiction of Hyderabad of South Central Railway zone.
The project
The project foundation was laid on 19 January 2014 at Medak by Sunita Laxma Reddy.[1] The total length of the section is 17.2 km (10.7 mi) and the total cost of the project is ₹1.293 billion (US$18 million).[2]
References
- ↑ "Foundation Stone laid for a new Railway line between Akkannapet-Medak – RailNews Media India Ltd". www.railnews.co.in. Retrieved 2016-05-20.
- ↑ Avadhani, R (18 January 2014). "Medak-Akkannapet railway line works to begin soon". The Hindu. Retrieved 20 May 2016.