Macau Refuse Incineration Plant

Coordinates: 22°9′39.5″N 113°34′21.2″E / 22.160972°N 113.572556°E / 22.160972; 113.572556

Macau Refuse Incineration Plant
澳門垃圾焚化中心
Incineração de Resíduos Sólidos de Macau
General information
Type Incinerator
Location Taipa, Macau, China
Opening 1992
Technical details
Floor area 4.5 hectares

The Macau Refuse Incineration Plant (MRIP; Chinese: 澳門垃圾焚化中心; Portuguese: Incineração de Resíduos Sólidos de Macau) is an incinerator in Taipa, Macau, China.

History

The plant was commissioned in 1992. In 2009, the waste processing capacity of the plant was doubled.[1] [2]

Architecture

The plant spans over an area of 4.5 hectares.[3]

Technical details

The plant has a waste processing facility of 1,728 tons per day being done by its six incinerators, with the current capacity of 1,400 tons/day.[3][4]

See also

References

  1. "Macao Refuse Incineration Plant (operation and maintenance)" (PDF). Consulasia. Retrieved 29 August 2017.
  2. "Macau Refuse Incineration Plant – Expansion and Refurbishment – 2005/ 2009" (PDF). MPS Industrial. CESL Asia.
  3. 1 2 "Technical visit, Macau Refuse Incineration Plant". 2016 MIECF, Macau International Environmental Cooperation Forum and Exhibition.
  4. Marques, Renato (30 August 2017). "Seeking Solutions for 'Too Much in Our Bins'". Macau Daily Times. Retrieved 30 August 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.