M8 Bridge to Nowhere

Bridge to Nowhere is a nickname used to refer to various unfinished structures around the M8 motorway in the centre of Glasgow, Scotland. They were built in the 1960s as part of the Glasgow Inner Ring Road project but left incomplete for several years. One 'bridge', at Charing Cross, was completed in the 1990s as an office block. The Anderston Footbridge, a pedestrian bridge south of St Patrick's church, was finally completed in 2013 as part of a walking and cycling route.[1]

A third 'Bridge to Nowhere' was created in 2008 following the demolition of a hotel a few blocks away from the M8 but its remains were finally removed in 2017.

Charing Cross Podium

The Charing Cross Podium with Tay House built on the structure

The structure officially called the Charing Cross Podium, was always intended to have a development of some sort on the top level. However, the incomplete structure looked like a bridge and was often referred to as the 'Bridge to Nowhere'.

When the western flank of the inner ring road was being prepared for tender in the mid-1960s the designer, Scott Wilson & Partners, advised Glasgow Corporation to include the development as part of the motorway construction contract. This advice was ignored with the Corporation hoping that a developer would take on the project, along with the costs. The original masterplan for the area was devised by the architectural firm Richard Seifert & Partners, which entailed the construction of two large megastructures in the area - one of which was the Anderston Centre, the other being the Charing Cross Complex, the latter making use of the podium structure.[2] In the end, the Charing Cross scheme was scaled back considerably in scope and size, and the result was the podium remained incomplete for over two decades, attracting much notoriety at a time when the entire M8 construction project was the subject of very divided public opinion. In the mid-1990s Glasgow District Council at last found an interested party, and a short time later an office block was built. Occupiers of the building known as Tay House include Barclays Bank.

Anderston Footbridge

The Anderston Pedestrian Footbridge, looking east, shown following its completion in 2013, with the Anderston Centre tower blocks, Glasgow Marriott and the Argyle Building in the background

The Anderston Footbridge, 600 m (660 yd) south of the Charing Cross Podium, was originally planned as the main pedestrian connection between the new housing estates on the western side of the motorway to the Anderston Cross Commercial Centre but the size of the latter development was scaled back in size – meaning that the bridge terminated in mid-air above the vacant land, which was eventually built upon in 1981 when a Holiday Inn hotel (nowadays the Glasgow Marriott) was constructed on the site.

Architects model from the 1960s of the uncompleted section of the Anderston Centre and the M8 Motorway showing the intended course of the bridge. The red circle shows where the bridge construction was abandoned. The present day Marriott and Hilton hotels now stand on this site.

As a highly visible structure, it assumed the title of 'Bridge to Nowhere' from the Charing Cross Podium after that was built on and lost its bridge-like appearance.

A proposal by charity Sustrans, under their national Connect2 programme, aimed to finish the construction, as well as connecting the bridge with a second one over the Clydeside Expressway. This should increase pedestrian and cycle access to central Glasgow on a route between Kelvingrove Park and the city centre. Sustrans won the funding in September 2011 – work to finally complete the bridge began in 2012 and was completed by July 2013.[3][4]

The third bridge

Glasgow gained a third "Bridge to Nowhere" in 2008 on a street a few hundred metres to the east of the Anderston Footbridge. The former Albany Hotel was demolished leaving the pedestrian bridge, connecting it to the adjacent Anderston Centre, terminating in mid air over Bishop Lane at the end of Waterloo Street. The hotel was controversially razed[5] in preparation for a new complex called Bothwell Plaza. The hotel development received planning permission in 2009[6] but remained unbuilt until 2016, when it was reimagined as an office complex called Bothwell Exchange. The remains of bridge were finally removed in 2017 when construction on this scheme started.

References

  1. "Glasgow's 'Bridge to Nowhere' finally completed". BBC News. 7 July 2013.
  2. Williamson; Riches; Higgs (1990). Glasgow. Yale University Press. p. 214. ISBN 9780300096743.
  3. Stewart-Robertson, Tristan (1 September 2011). "Exclusive: M8 'Bridge To Nowhere' To Be Finished". The Glaswegian. Archived from the original on 30 March 2012. Retrieved 22 February 2017.
  4. "Glasgow's 'Bridge to Nowhere' finally completed". BBC News. BBC. 8 July 2013. Retrieved 8 July 2013.
  5. "The end for 'The Albany' as 150 face axe at city hotel". Evening Times. 17 January 2007. Retrieved 22 February 2017.
  6. "Bothwell Plaza rises again". Urban Realm. 10 February 2009. Retrieved 22 February 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.