Line 7 (Suzhou Rail Transit)

Line 7
 7 
Overview
Type Rapid transit
System Suzhou Rail Transit
Status Under construction
Stations 7
Operation
Owner Suzhou Rail Transit Co., Ltd
Operator(s) Suzhou Rail Transit Co., Ltd
Technical
Line length 11.1km
Track gauge 1,435 mm (4 ft 8 12 in)

Line 7 is a planned lateral line of Line 4 of Suzhou Rail Transit. Construction is expected to start in 2012; the line will be 11.1 kilometers long. It has Tian'edang Parking area (Chinese: 天鹅荡停车场) in the line.[1] According to those plans the part of Line 4 between Shihulu and Wangshanlu stations will be operated as Line 7.[2]

References

  1. 顾蕾 (2012-02-10). 苏州轨交4号线及支线今年6月动工. 苏州日报 (in Chinese). Archived from the original on 2012-07-14. Retrieved 2012-06-19.
  2. "Archived copy". Archived from the original on 2012-07-13. Retrieved 2012-06-29. (Website of the subway operator "SZ-Transit" (苏州轨道交通/Suzhou Guidao Jiaotong) (information retrieved on Oct. 16th, 2010))


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.