Line 2 (Qingdao Metro)

Line 2
 2 
Licun Gongyuan (now Licun Park) station Line 2 platform
Overview
Type Rapid transit
System Qingdao Metro
Status In operation
Locale Qingdao, China
Termini Zhiquan Lu
Licun Gongyuan
Stations 18
Services 1
Operation
Opened 10 December 2017
Owner Government of Qingdao
Operator(s) Qingdao Metro Corporation
Character Underground
Rolling stock Chinese Type B1
Technical
Line length 20.422 km (12.69 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

The Line 2 of Qingdao Metro (Chinese: 青岛地铁2号线) is an underground metro line in Qingdao. The eastern section was opened on 10 December 2017 with 18 stations from Zhiquan Lu to Licun Gongyuan.[1]

Opening timeline

SegmentCommencementLengthStation(s)Name
Zhiquan Lu — Licun Gongyuan 10 December 2017 20.422 km (12.69 mi) 18 Phase 1

Stations

station name Connections Distance
km
Location
English Chinese
Zhiquan Road 芝泉路 0.00 0.00 Shinan
May 4th Square 五四广场  3  1.55 1.55
Fushansuo 浮山所 0.92 2.47
Yan'erdao Road 燕儿岛路 1.03 3.50
Gaoxiong Road 高雄路 0.80 4.30
Maidao 麦岛 1.16 5.46 Shinan/Laoshan
Haiyou Road 海游路 1.15 6.61 Laoshan
Haichuan Road 海川路 1.00 7.61
Hai'an Road 海安路 1.22 8.83
Shilaoren Beach 石老人浴场 1.54 10.37
Miaoling Road 苗岭路  11  1.04 11.41
Tong'an Road 同安路 1.49 12.90
Liaoyang East Road 辽阳东路 0.81 13.71
Donghan 东韩 1.48 15.19
Hualoushan Road 华楼山路 2.25 17.44 Licang
Zaoshan Road 枣山路 0.90 18.34
Licun 李村  3  1.07 19.41
Licun Park 李村公园 0.93 20.34

References

  1. "地铁2号线(东段)12月10日开通试运营". Qingdao Metro. Qingdao Metro. Retrieved 18 December 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.