Line 2 (Nanchang Metro)

Line 2
 2 
Overview
Other name(s) Nanchang Rail Transit Line 2
Native name 南昌地铁2号线
Type Rail Transit
System Nanchang Metro
Status Operational
Locale Nanchang, Jiangxi, China
Termini Metro Central
Nanlu
Stations 17
Operation
Depot(s) Nanchang West station MPD[1]
Rolling stock Model-B EMU, 6 cars coupled
Technical
Line length 19.6 km (12.2 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Overhead catenary, 1500 V DC
Operating speed 80 km/h (50 mph)

Nanchang Metro Line 2 (also known as Nanchang Rail Transit Line 2 in official documents) is a rail transit line under construction in Nanchang, planned to connect Jiulonghu (Chinese: 九龙湖) and Luojia Town (Chinese: 罗家镇); its Phase 1 starts at Zhanqian Nan Dadao (Chinese: 站前南大道) and ends at Xinjia'an (Chinese: 辛家庵), both termini designed for further extension. The Phase 1 is 23.3 km in length with 21 stations (including 6 transfer stations).[2] The construction of Phase 1 started in July 2013, and opened on 18 August 2017.[3]

Opening timeline

SegmentCommencementLengthStation(s)Name
Metro Central — Nanlu 18 August 2017 19.600 km (12.18 mi) 17 Phase 1 (Xinjian section)

Route and stations

station name Connections Distance
km
Location
English Chinese
Metro Central 地铁大厦  1  0.00 0.00 Qingshanhu/Donghu/Xinjian
Cuiyuan Road 翠苑路 1.38 1.38 Xinjian
Xuefu Avenue East 学府大道东  5  1.60 2.98
Qianhu Avenue 前湖大道 0.85 3.83
Lingbei 岭北 1.43 5.26
Wolongshan 卧龙山 1.30 6.56
International Sports Center 国体中心 1.17 7.73
Longgang 龙岗 1.60 9.33
Nanchang West RS 南昌西站 Nanchang West railway station NXG 1.09 10.42
South Square of West RS 西站南广场  4  Nanchang West railway station NXG 0.65 11.07
International Expo Center 国博 1.19 12.26
Yingtan Street 鹰潭街 1.29 13.55
Civic Center 市民中心 1.03 14.58
Jiulong Lake South 九龙湖南 1.19 15.77
Shengmi 生米 0.91 16.68
Dagang 大岗 1.21 17.89
Nanlu 南路 0.89 18.78

Rolling stock

Nanchang Metro Line 2 is planned to be operated with Model-B rolling stock with maximum speed of 80 km/h. 22 trains of 6 EMUs, 132 cars in total will be operated at the first stage. These cars are 2.8 m in width, 3.8 m in height and 19 m in length, providing the system with maximum capacity of 30 000 to 55 000 passenger per hour per direction, and minimum service interval of 2 minutes.[4]

Future development

In the initial plan of 2008, Line 2 spans from Luojia Town in the east to Wangcheng (Chinese: 望城) in the west, and is 39 km in length in the long-term plan.[5] Its Phase 1 starts from CR Nanchang West station to Hongdu Zhong Dadao,[6] which was extended to Xinjia'an to the east in the end of 2010 and then extended further south to Jiulonghu in early 2013.[7][8]

  • South extension: Phase 2 extends Line 2 from Zhanqian Nan Dadao, which is transferrable to Line 4 to Shengmi Town;
  • East extension: Phase 2 extends Line 2 to Luojia town via Xinjia'an.

References

  1. "Nanchang Metro map". Sinaming.cn (in Chinese).
  2. "南昌轨道交通2号线基本情况" (in Chinese). 28 December 2011. Archived from the original on 29 October 2013.
  3. "南昌地铁2号线7月全线开工 卧龙山站今日正式动工". jxnews.com (in Chinese). 15 January 2013.
  4. "南昌地铁拟采用B型车 单向每小时载乘客5.5万人次". jxnews.com.cn (in Chinese). 18 November 2008.
  5. "南昌地铁远景规划征询民意(图)". jxnews.com.cn (in Chinese). 16 October 2008.
  6. "南昌地铁一期勘察招标 拟于2015年完工投运". jxnews.com.cn (in Chinese). 21 April 2009.
  7. "南昌地铁2号线拟南延增8站 下穿九龙湖抵达生米大道". jxcn.cn (in Chinese). 5 February 2013.
  8. "南昌地铁2号线拟南延至九龙湖 新增8个站点". jxnews.com.cn (in Chinese). 4 February 2013.