Line 1 (Ürümqi Metro)

Line 1
 1 
Overview
Type Rapid transit
System Ürümqi Metro
Locale Ürümqi, Xinjiang, China
Termini Balou
International Airport
Stations 12
Operation
Opened 8 July 2018
Operator(s) Ürümqi Metro Group Corporation Ltd
Character Elevated & underground
Technical
Line length 16.56 km (10.29 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)
Operating speed 120 km/h
Line 1
Chinese name
Simplified Chinese 乌鲁木齐地铁1号线
Traditional Chinese 烏魯木齊地鐵1號線
Uyghur name
Uyghur
ئۈرۈمچى مېتروسى
1- لىنىيە

Line 1 of the Ürümqi Metro is a subway line in Ürümqi running from Balou to International Airport, currently it has 12 stations and is 16.56 kilometres (10.29 mi) long. It was to begin operations on 8 July 2018 currently the northern section is under debugging and trial runs.[1]

History

The 26.5-kilometre long, 21-station initial phase of the line commenced construction on March 2014.[2] Tunneling works were completed on December 2017. The northern section of Line 1 will become operational by 8 July 2018.[1]

Opening timeline

SegmentCommencementLengthStation(s)Name
Balou — International Airport 8 July 2018 16.56 km (10.29 mi) 12 Phase 1 (northern section)

Stations

Northern section
station name Transfer Distance
km
Location
English Chinese Uyghur
Balou 八楼 اسەككىز قەۋەت 0.00 0.00 Saybag/Xinshi
Xinjiang Library 新疆图书馆 شىنجاڭ كۈتۈپخانا 1.08 1.08 Xinshi
Zhongyinggong 中营工 جۇڭيىڭگۇڭ 0.90 1.98
Xiaoxigou 小西沟 شياۋشىگۇ 1.49 3.47
Tieluju 铁路局 تۆمۈريول ئىدارىسى 1.22 4.69
Sports Center 体育中心 تەنتەربىيە مەركىزى 1.23 5.92
Botanical Garden 植物园 ئۆسۈملۈكلەر باغچىسى 1.18 7.10
Yingbin Road Crossing 迎宾路口 مەرھابا يولى ئېغىزى 1.24 8.34
Sangong 三工 سەنگۇڭ 1.35 9.69
Xuanrendun 宣仁墩 شۇەنرېندۈن 1.21 10.90
Dadiwopu 大地窝堡 چوڭ دىئوپو 2.70 13.60
International Airport 国际机场 خەلقئارا ئايروپورت Ürümqi Diwopu International Airport URC 2.96 16.56
Southern section
station name Distance
km
Location
English Chinese Uyghur
Santunbei 三屯碑 ئۈچتاش 0.00 0.00 Tianshan
Xinjiang University 新疆大学 شىنجاڭ ئۇنىۋېرسىتېتى 0.66 0.66
Erdaoqiao 二道桥 دۆڭكۆۋرۈك 1.24 1.90
Nanmen 南门 ئاققۇۋۇق 1.49 3.39
Beimen 北门 تۆگە دەڭ 0.95 4.34
Xinxing Street 新兴街 شىنشىڭ كوچىسى 1.29 5.63 Shuimogou
Nanhu Square 南湖广场 يىكەنكۆل مەيدانى 1.09 6.72
Nanhu North Road 南湖北路 يىكەنكۆل شىمالىي يولى 1.27 7.99
Wangjialiang 王家梁 ۋاڭجيالياڭ 1.15 9.14

References

  1. 1 2 "乌鲁木齐地铁1号线北段6月底将载客试运营". Xinhua. Urumqi Evening News. Retrieved 29 March 2018.
  2. "乌鲁木齐地铁1号线年底可全线试运营". Sina. Xinjiang Morning News. Retrieved 29 March 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.