Line 1 (Ürümqi Metro)
Line 1 | |
---|---|
1 | |
Overview | |
Type | Rapid transit |
System | Ürümqi Metro |
Locale | Ürümqi, Xinjiang, China |
Termini |
Balou International Airport |
Stations | 12 |
Operation | |
Opened | 8 July 2018 |
Operator(s) | Ürümqi Metro Group Corporation Ltd |
Character | Elevated & underground |
Technical | |
Line length | 16.56 km (10.29 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Operating speed | 120 km/h |
Line 1 | |||||||||||
Chinese name | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Simplified Chinese | 乌鲁木齐地铁1号线 | ||||||||||
Traditional Chinese | 烏魯木齊地鐵1號線 | ||||||||||
| |||||||||||
Uyghur name | |||||||||||
Uyghur |
ئۈرۈمچى مېتروسى 1- لىنىيە | ||||||||||
|
Line 1 of the Ürümqi Metro is a subway line in Ürümqi running from Balou to International Airport, currently it has 12 stations and is 16.56 kilometres (10.29 mi) long. It was to begin operations on 8 July 2018 currently the northern section is under debugging and trial runs.[1]
History
The 26.5-kilometre long, 21-station initial phase of the line commenced construction on March 2014.[2] Tunneling works were completed on December 2017. The northern section of Line 1 will become operational by 8 July 2018.[1]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Balou — International Airport | 8 July 2018 | 16.56 km (10.29 mi) | 12 | Phase 1 (northern section) |
Stations
- Northern section
station name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | Uyghur | ||||
Balou | 八楼 | اسەككىز قەۋەت | 0.00 | 0.00 | Saybag/Xinshi | |
Xinjiang Library | 新疆图书馆 | شىنجاڭ كۈتۈپخانا | 1.08 | 1.08 | Xinshi | |
Zhongyinggong | 中营工 | جۇڭيىڭگۇڭ | 0.90 | 1.98 | ||
Xiaoxigou | 小西沟 | شياۋشىگۇ | 1.49 | 3.47 | ||
Tieluju | 铁路局 | تۆمۈريول ئىدارىسى | 1.22 | 4.69 | ||
Sports Center | 体育中心 | تەنتەربىيە مەركىزى | 1.23 | 5.92 | ||
Botanical Garden | 植物园 | ئۆسۈملۈكلەر باغچىسى | 1.18 | 7.10 | ||
Yingbin Road Crossing | 迎宾路口 | مەرھابا يولى ئېغىزى | 1.24 | 8.34 | ||
Sangong | 三工 | سەنگۇڭ | 1.35 | 9.69 | ||
Xuanrendun | 宣仁墩 | شۇەنرېندۈن | 1.21 | 10.90 | ||
Dadiwopu | 大地窝堡 | چوڭ دىئوپو | 2.70 | 13.60 | ||
International Airport | 国际机场 | خەلقئارا ئايروپورت | 2.96 | 16.56 | ||
- Southern section
station name | Distance km |
Location | |||
---|---|---|---|---|---|
English | Chinese | Uyghur | |||
Santunbei | 三屯碑 | ئۈچتاش | 0.00 | 0.00 | Tianshan |
Xinjiang University | 新疆大学 | شىنجاڭ ئۇنىۋېرسىتېتى | 0.66 | 0.66 | |
Erdaoqiao | 二道桥 | دۆڭكۆۋرۈك | 1.24 | 1.90 | |
Nanmen | 南门 | ئاققۇۋۇق | 1.49 | 3.39 | |
Beimen | 北门 | تۆگە دەڭ | 0.95 | 4.34 | |
Xinxing Street | 新兴街 | شىنشىڭ كوچىسى | 1.29 | 5.63 | Shuimogou |
Nanhu Square | 南湖广场 | يىكەنكۆل مەيدانى | 1.09 | 6.72 | |
Nanhu North Road | 南湖北路 | يىكەنكۆل شىمالىي يولى | 1.27 | 7.99 | |
Wangjialiang | 王家梁 | ۋاڭجيالياڭ | 1.15 | 9.14 |
References
- 1 2 "乌鲁木齐地铁1号线北段6月底将载客试运营". Xinhua. Urumqi Evening News. Retrieved 29 March 2018.
- ↑ "乌鲁木齐地铁1号线年底可全线试运营". Sina. Xinjiang Morning News. Retrieved 29 March 2018.
This article is issued from
Wikipedia.
The text is licensed under Creative Commons - Attribution - Sharealike.
Additional terms may apply for the media files.