Bundesautobahn 94

A94 shield}}

A94
Bundesautobahn 94
Route information
Length 70 km (40 mi)
85 km planned
Location
States Bavaria
Highway system
A 93A 95

Bundesautobahn 94 (translates from German as Federal Motorway 94, short form Autobahn 94, abbreviated as BAB 94 or A 94) is an autobahn in southern Germany. When completed, it will connect Munich with Passau. Currently, only the parts Munich-Pastetten, HeldensteinBurghausen, and a small section in Malching have been built. Between Burghausen and Simbach am Inn, there is a 14 kilometer, two-lane section that is signed as Bundesstraße 12. Provisions for an upgrade to A 94 exist here.

The route between Forstinning and Heldenstein was the subject of a decades-long debate.

History

In the original plans for the A 94, the section between Simbach and Passau was not planned. Instead, the A 94 was supposed to cross the Inn to the Austrian border, at which point it would continue through the Innviertel to Ried im Innkreis and connect to the Austrian A 8 towards Vienna. This path would have decreased travel time from Munich to Vienna compared to the route via Salzburg. Provisions for such a routing were built in Simbach and in Ried. However, since Austria didn't want to burden the Innviertel with traffic, the plan was given up on the Austrian side. After this, on the German side, the plans were changed so that the A 94 connected with the A 3 at Pocking/Neuhaus am Inn. This makes an eventual northern extension to the Czech border possible.

At one point, a route from Mühldorf to Pfarrkirchen to Pocking was planned. Under this plan, today's A 94 section from Mühldorf to Simbach would have been given the designation A 942.

Exit list

() München-Steinhausen
Tunnel Seitentunnel Einsteinstraße 420 m
() München-Vogelweideplatz

(1) München-Steinhausen
(2) München-Zamborf
(3) München-Daglfing
Bahnbrücke 60 m
(4) München-Am Moosfeld
(5) München-Riem
(6) Feldkirchen-West
(7) Feldkirchen-Ost
(8) München-Ost 4-way interchange
(9a) Parsdorf
(9b) Markt Schwaben
(10) Anzing
(11) Forstinning
(12) Hohenlinden
Rest area Holzfeld/Auwiesen
(13) Pastetten
Isentalbrücke 590 m
14 (under construction)
Lappachtalbrücke 280 m
Dorfen (under construction)
Goldachtalbrücke
Rimbachtalbrücke
Talbrücke Ornauer Bach
Obertaufkirchen (under construction)
Heldenstein (under construction)

Heldenstein (Wegfall)
End of the motorway
Tunnel Einhausug Wimpasing 680 m
(18) Waldkraiburg/Ampfing
(19) Mühldorf-West
(20) Mühldorf-Nord
(21) Töging
Aubachbrücke 80 m
(22) Altötting
Isenbrücke 120 m
(23) Neuötting
Innbrücke 470 m
(24) Neuötting-Ost
Alzbrücke 90 m
(25) Burghausen
End of the motorway

Innbrücke 330 m
Türkenbackbrück 110 m
Stammham
parking area
Braunau-Neustadt B 148 (Austria)
Simbach-West
Erlach
Mühlau
parking area
Ering-Nord local diversion
Ering-Ost local diversion
Ering/Müinchham local diversion
Malching local diversion

End of the motorway
(-) provisional connection
(30) Malching
(-) provisional connection

Tunnel Einhausung 450 m (planned)
Kirchham (planned)
Talbrücke Kößlarner Bach 220 m (planned)
Pocking-West / Bad Füssing (planned)
(planned)
Pocking-Mitte (planned)
Tunnel Wilddurchlass 50 m (planned)
Pocking-Nord / Ruhstorf (planned)
Kreuz Pocking (planned)


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.