Big Tujunga Dam

Big Tujunga Dam
View of the dam and reservoir from upstream
Country United States
Location Angeles National Forest, Los Angeles County, California
Coordinates 34°17′36″N 118°11′18″W / 34.29333°N 118.18833°W / 34.29333; -118.18833Coordinates: 34°17′36″N 118°11′18″W / 34.29333°N 118.18833°W / 34.29333; -118.18833
Opening date 1931
Owner(s) Los Angeles Department of Water and Power
Dam and spillways
Type of dam Concrete arch
Impounds Big Tujunga Creek
Height 208 ft (63 m)
Height (foundation) 244 ft (74 m)
Length 830 ft (250 m)
Spillway type Concrete-lined overflow
Spillway capacity 90,000 cu ft/s (2,500 m3/s)
Reservoir
Creates Big Tujunga Reservoir
Total capacity 5,960 acre⋅ft (7,350,000 m3)
Catchment area 82 sq mi (210 km2)

Big Tujunga Dam is a 244-foot (74 m)-high concrete arch dam in Los Angeles County, California, spanning Big Tujunga Canyon northeast of Sunland, in the foothills of the San Gabriel Mountains. Completed in 1931, it provides flood control and groundwater recharge for the San Fernando Valley.

Its reservoir is called Big Tujunga Reservoir, and collects runoff from a watershed of 82 square miles (210 km2). Although it is located inside the Angeles National Forest, public access to the lake is forbidden. The water is usually kept at a low level, in order to protect against winter floods.

Description

The dam is 208 feet (63 m) high from the riverbed, 244 feet (74 m) high from the foundations, and 830 feet (250 m) long. It has a width of 138 feet (42 m) at the base, tapering to 8 feet (2.4 m) at the crest. The storage capacity is 5,960 acre⋅ft (7,350,000 m3) at the spillway, with a minimum pool of 1,210 acre⋅ft (1,490,000 m3) to prevent sediment and debris from entering the dam's outlets.[1]

After the completion of Hansen Dam downstream, the importance of Big Tujunga Dam for flood control has decreased; however, it is still directly responsible for protecting about 4,600 residents living in the floodplain of Big Tujunga Canyon.[1] In addition, the dam conserves about 4,500 acre⋅ft (5,600,000 m3) of runoff per year for drinking water and groundwater recharge purposes.[2] This saves the city of Los Angeles about $2,250,000 annually due to the cost difference between local and imported water.[3]

Because of the small storage capacity of the reservoir relative to the size of its watershed, frequent dredging is required to remove sediment from behind the dam. Most of the sediment is compacted and stored at the Maple Canyon Sediment Placement Site located less than 1 mile (1.6 km) west of the dam. The 2009 Station Fire, which burned some 87 percent of the Big Tujunga watershed, caused more than 2 million cubic yards (1.5 million m3) of sediment to flow into the reservoir, all of which had to be subsequently removed.[4]

History

Big Tujunga Dam appearance before seismic retrofit

The dam was completed in 1931 by the Los Angeles Department of Water and Power, at a cost of $1.2 million ($19.3 million in 2017 dollars).[2] It was originally planned as one of several flood control dams inside Big Tujunga Canyon and was thus referred to as Big Tujunga Dam No. 1 until the larger Hansen Dam was completed in 1940 at the mouth of the canyon, eliminating the need for the other dams.[5] During the Los Angeles flood of 1938, the dam was able to stop a huge debris flow of boulders and uprooted trees, sparing much of Sunland, Tujunga and Glendale from destruction.[2]

In 1976, the dam was recognized as in danger of failure from earthquakes (the San Andreas Fault runs nearby) and the reservoir's level was temporarily restricted to about 25% of capacity.[6] In 2008 the Los Angeles County Flood Control District began a project to rehabilitate the aging structure.[7] Approximately 75,000 cu yd (57,000 m3) of concrete was added to the dam, transforming it from a thin-arch to a thick-arch design. A new spillway was built and the original one was expanded, increasing the floodwater capacity from 23,000 cu ft/s (650 m3/s) to more than 90,000 cu ft/s (2,500 m3/s).[5] In addition, a 24-inch (610 mm) valve was installed at the dam base to pass low flows for habitat conservation.[3] The seismic retrofit project was completed in July 2011 at a cost of $100 million.[8]

See also

References

  1. 1 2 "Final Environmental Assessment: Big Tujunga Dam" (PDF). Federal Emergency Management Agency. Apr 2006. Retrieved 2017-08-17.
  2. 1 2 3 Bartholomew, Dana (2011-07-21). "Dam renovation expected to help cut water costs". Los Angeles Daily News. Retrieved 2017-08-17.
  3. 1 2 Tarbox, Glenn; Iso-Ahola, Vik (2012-02-13). "Bracing for Impact at Big Tujunga Dam". International Water Power & Dam Construction. Retrieved 2017-08-17.
  4. "Big Tujunga Reservoir Sediment Removal Project Frequently Asked Questions" (PDF). Los Angeles County Department of Public Works. Retrieved 2017-08-17.
  5. 1 2 "The Sustainability of Experience — Investing in the Human Factor" (PDF). 28th Annual USSD Conference. United States Society on Dams. 2008. p. 59. Retrieved 2011-10-16.
  6. "Big Tujunga Dam Seismic Upgrade" (PDF). Los Angeles Department of Public Works. 2006-01-05. Archived from the original (PDF) on 2010-12-17. Retrieved 2011-10-16.
  7. Carlsen, Robert (2011-12-05). "Big Tujunga Dam". ENRCalifornia. Retrieved 2017-08-17.
  8. "Big Tujunga Dam Seismic Retrofit Project completed". Daily News. 2011-07-21. Retrieved 2011-10-16.



This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.